My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packets - 2019/04/08
MoundsView
>
Commissions
>
City Council
>
Agenda Packets
>
2010-2019
>
2019
>
Agenda Packets - 2019/04/08
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2025 4:47:10 PM
Creation date
5/3/2019 3:50:30 PM
Metadata
Fields
Template:
MV Commission Documents
Commission Name
City Council
Commission Doc Type
Agenda Packets
MEETINGDATE
4/8/2019
Supplemental fields
City Council Document Type
City Council Packets
Date
4/8/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Striping <br />Rank Contractor Total Bid Mounds View only) <br />Low AAA Striping Service $2,126.32 <br />1 Sir Lines -A -Lot $2,240.50 <br />The bid is a unit price bid meaning payment will be made based on measured quantities. The <br />costs provided to the JPA $1.04/syd. The 2019 budget includes funding of $188,000 to perform <br />the proposed seal coat work in the Street Improvement Fund (485-4470-7050). <br />As part of the JPA with Coon Rapids, Mounds View has a 30 -day `opt -out' period during which <br />Mounds View can completely opt out of the contract, in addition to adjusting the planned <br />quantities. Prior to the expiration of this 30 -day period (April 15, 2019), Mounds View needs to <br />provide either a concurrence or an opt -out notification to Coon Rapids. Coon Rapids expects <br />to award the contract at their April 16, 2019 Council Meeting. Once the contractor begins work, <br />Mounds View will inspect/approve the work and invoiced accordingly. <br />In addition, the construction cost with the JPA includes an administrative fee to be paid to Coon <br />Rapids no later than 90 days after the contract award. This administrative fee is based on a <br />sliding scale, and the following table calculates the fee that will be required as part of this <br />contract as well as the total project cost. The administrative fee covers advertising, <br />specification preparation, legal review and other overhead costs that City of Mounds View staff <br />would be required to complete if the city went out for bids independently. This administrative <br />Project Cost (Based on Low Bid) <br />Admin Cost <br />Admin Cost <br />Construction Cost <br />(Percentage) <br />(Low Bid) <br />$0-$50,000 <br />2.00% <br />$ 1,000.00 <br />$50,001 - $100,000 <br />1.50% <br />$ 391.81 <br />Over$100,000 <br />1.00% <br />$ - <br />TotalAdmin Cost <br />$ <br />1,795.96 <br />Construction Cost <br />$ <br />104,595.98 <br />Contingency Cost (10%) <br />$ <br />10,459.98 <br />TOTAL PROJECT COST <br />$ <br />116,851.92 <br />fee adds approximately $0.02/syd to the cost of the project. <br />Strategic Plan Strategy/Goal: Maintain and Plan for Infrastructure Improvements. <br />Financial Impact: No Financial Impact to the 2019 Budget. Street Improvement Fund account <br />485-4470-7050 has $188,000.00 budgeted for these improvements. <br />Recommendation: <br />Public Works recommends that the City Council approve the attached resolution and concur <br />with the award of the contract to Allied Blacktop. Additionally, Staff further recommends a 10% <br />contingency of $10,459.98 for quantity over -runs or additional work resulting from unknowns <br />discovered during construction. Additionally, Council should authorize the Administrative Cost <br />of $1,795.96 not to exceed $116,851.92 for the seal coating project. <br />Respectfully submitted, <br />Don Peterson, Public Works Director <br />
The URL can be used to link to this page
Your browser does not support the video tag.