Laserfiche WebLink
Technical Memorandum <br />Re: Mounds View — 2019 Water Treatment Plant Rehabilitation Introduction <br />September 30, 2019 <br />BOOSTER STATION <br />The existing Booster Station and Reservoir were constructed back in 1969. Since then, no major <br />improvements have been made aside from the addition of a small reservoir bypass line and <br />booster pump motor replacement. This following list summarizes the proposed replacement and <br />facility upgrades. <br />1. Electrical lighting and control system replacement <br />2. Replacement of the existing diesel generator with a natural gas generator <br />3. Select process valve replacement <br />4. Upsizing the existing 4" reservoir bypass line to an 8" line to improve operation <br />S. Addition of (2) gate valves on the exterior of the facility to allow complete bypass of <br />Booster Station <br />The views provided in Figure 3 and Figure 4 represent the proposed demolition and proposed <br />improvements within the Booster Station. <br />NEXT STEPS <br />The following tentative timeline is proposed for the bidding package described herein: <br />1. Request to authorize bid advertisement at October 10, 2019 Council Meeting <br />2. Publish bid advertisement on October 301h, 2019 <br />3. Conduct bid opening on November 26th, 2019 at 2:00 PM <br />4. Award construction contract at December 9th, 2019 Council Meeting <br />P01008-2013-001 Page 3 of 7 <br />Think Big. Go Beyond. �} �r www.ae2s.com <br />