Laserfiche WebLink
r: FIE S <br />TECHNICAL MEMORANDUM <br />To: Don Peterson, Director of Public Works <br />From: Aaron Vollmer, PE and Abbie Browen, PE, Advanced Engineering and <br />Environmental Services, Inc. (AE2S) <br />Re: Mounds View — 2019 Water Treatment Plant Rehabilitation Introduction <br />October 7th, 2019 Council Work Session Information <br />Date: September 30, 2019 <br />BACKGROUND <br />The Public Works Department has many responsibilities including efficiently operating the water <br />distribution system. The system includes (6) wells, an elevated water tower, a ground reservoir, a <br />booster station and (3) water treatment plants (WTP). <br />The water treatment systems have been in operation for over 25 years with no major upgrades <br />or repairs to the system. Routine maintenance has been performed on the well motors and <br />pumps and the operating systems and controls have had only minor repairs. Public Works has <br />discovered that many of the components are obsolete and no longer are available to make <br />repairs. <br />Back on October 3'd, 2016, the Public Works Department, with AE2S, presented the findings of a <br />water production study and water system management program to the City Council. At this <br />meeting staff recommended engineering and bidding for the needed improvements in 2019, <br />with construction taking place in 2020 and 2021. <br />At the March 25th, 2019 Council Meeting, the City Council approved AE2S to perform a water <br />study and proceed with design and bidding phases of the rehabilitation of WTP No. 1, WTP No. <br />2, WTP No. 3, and the Booster Station. Currently, AE25 is working towards the 95% milestone of <br />the final design phase, with bidding anticipated at the end of October. <br />The following sections describe the scope of the rehabilitation at each facility. The purpose of <br />this technical memorandum is to summarize for and inform City Council of the planned <br />improvements to be including in the bidding package to be awarded by the end of 2019. <br />P01008-2013-001 Page 1 of 7 <br />Think Big. Go Beyond. 40www.ae2s.com <br />40 ncs- <br />