Laserfiche WebLink
Item No: 05D <br />M7 �m Meeting Date: June 19, 2019 <br />OUNDS VIEW Type of Business: Planning Case MU19-001 <br />City of Mounds View Staff Report <br />To: Mounds View Planning Commission <br />From: Jon Sevald, Community Development Director <br />Item Title/Subject: Resolution 1099-19, Recommending Approval of a <br />Residential Planned Unit Development and Development <br />Review for a Multi -Family Dwelling to be located at 2390, <br />2394 Mounds View Boulevard, and 2400 County Road H2 <br />(Planning Case MU19-001) <br />Introduction <br />INH Properties is proposing to develop a 128 -unit apartment building at the south corner of <br />Mounds View Boulevard and County Road H2. The project involves multiple planning <br />applications, including a request for a CUP for a PUD, and a Development Review. To simplify <br />this process, the CUP and Development Review have been combined into one Resolution. <br />Discussion <br />Within a PUD district, a Conditional Use Permit (CUP) may be issued for a Residential PUD', <br />Commercial/Industrial PUD, or Mixed -Use PUD, subject to an approved "PUD Narrative' which <br />establishes project restrictions (e.g. refers to the approved site plan, landscaping, building <br />design & materials, etc.). <br />A Development Review is required for projects which include building projects of 10,000 sq ft or <br />greater, or building additions of 10% or greater (excluding single-family homes). The proposed <br />apartments will be 144,934 sq ft in total area. <br />In general, the process of approving a PUD is a give & take. The City approves variations <br />(gives) from standard City Code requirements, in return for (takes) higher standards in building <br />and site design than the minimum required by the City Code. PUD's are intended to allow <br />flexibility, within the limits of the PUD Narrative. A PUD Narrative will be drafted prior to City <br />Council meetings, and include any recommendations of the Planning Commission. <br />Analysis <br />Proiect Size <br />4.06 acres (minimum 3 -acres required as a PUD). <br />Zoning <br />The property is proposed to be zoned PUD, and is within the County Road 10 Corridor Overlay <br />District. The overlay district has greater standards for building design and landscaping, which <br />may be superseded as a PUD. <br />1 City Cade, Section 1120.03, Subd 1(a) (Purpose) <br />