My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01-26-2012 Agenda and Packet
MoundsView
>
Commissions
>
Parks, Recreation & Forestry Commission
>
Agenda Packets
>
2010-2019
>
2012
>
01-26-2012 Agenda and Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/10/2024 2:10:50 PM
Creation date
4/1/2020 10:56:05 AM
Metadata
Fields
Template:
MV Parks, Recreation & Forestry Commission
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Trailway System Plan - DRAFT 2 North/South Routes Bike- way Walk- way Connecting Landmarks and Regional Trailways Status – Gaps - Plans Striped lanes 4-8’, both sides, from CR 10 to CR J/ 85th Ave. MSA route north of CR 10 Gap: No striped lanes from Bronson to CR10 Groveland Road Yes No • Connects with Groveland Park • Connection with Blaine trailway along CR J/ 85th Ave Plan: Future implementation of trailway with local street project Concrete sidewalk, on east side, from CR H, through CR 10, continuing on Red Oak Dr to Hillview Rd. MSA route north of CR 10 (Red Oak Dr) Gap: No controlled walk/bike features from Hillview Rd to Long Lake Rd coinciding with bump outs Silver Lake Road – Red Oak Drive Yes Yes • Full North/South route: Connects Silver View and Woodcrest Parks • Connection with Rice Creek trailway with Long Lake Park and the Mississippi River trailway as destinations • Connection with Blaine trailway along CR J/ 85th Ave Plan: Mark trailway on west side Concrete sidewalk, on west side, from south end to Eastwood Dr. On street marked 4’ wide striped lane, both sides, from CR H to CR H2 and CR I to Eastwood Gaps: North end west from Eastwood Dr has no controlled walk/bike features. No striping between CR H2 to CR I Long Lake Road Yes Yes • Full North/South route: Connects Random and Arden Parks and Irondale HS. Connection with Rice Creek Trailway with Long Lake Park and the Mississippi River trailway as destinations Plan: Future implementation with local street project Concrete sidewalk, east side, and striped lanes, both sides, from CR H to CR H2. Concrete sidewalk, west side, from CR H2 to CR 10, and both sides from CR 10 to Bronson Ave, changing to striped lanes, both sides, to CR I. MSA route from south border to CR I Gap: No sidewalk north of Bronson. No controlled walk/bike features north of CR I Edgewood Drive Yes Yes • Connects Edgewood MS, City Hall, City Hall Park, Police Station and Community Center Plan: Future implementation of trailways with local street project Striped lanes, both sides, from CR 10 to Hillview Rd. Concrete sidewalk, on east side, from Hillview Rd to CR H2. MSA route along majority of length Gap: Bikes must use sidewalk Quincy Street Yes Yes • Connects Oakwood and Greenfield Parks, Pinewood Elementary and industrial park Plan: Future implementation of bikeway with local street project
The URL can be used to link to this page
Your browser does not support the video tag.