My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01-26-2012 Agenda and Packet
MoundsView
>
Commissions
>
Parks, Recreation & Forestry Commission
>
Agenda Packets
>
2010-2019
>
2012
>
01-26-2012 Agenda and Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/10/2024 2:10:50 PM
Creation date
4/1/2020 10:56:05 AM
Metadata
Fields
Template:
MV Parks, Recreation & Forestry Commission
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Trailway System Plan - DRAFT 3 East/West Routes Bike- way Walk- way Connecting Landmarks and Regional Trailways Status – Gaps - Plans Sidewalk along north (Blaine) side of route Gap: No controlled walk/bike features along south (Mounds View) side of route Co Rd J (85th) No Yes • Full East/West route • Connection to Blaine trailway along CR J/ 85th Ave Plan: Future implementation of walkway On street 4’ wide lane, both sides, from Spring Lake Rd to Eastwood Rd. MSA route Gap: No controlled walk/bike features from Eastwood Rd to Long Lake Rd Arden Avenue No Yes • Connects with Groveland and Arden Parks Plan: Future implementation of walkway with local street project On street 4-8’ wide lane, both sides, from Red Oak Dr to east end. MSA route along majority of length Gap: NA Hillview Road No Yes • Connects Hillview and Greenfield Parks Plan: Maintain Concrete sidewalk, on north side, from west end to Silver Lake Rd. Sidewalk changes to south side from Silver Lake Rd to Long Lake Rd. Sidewalk, both sides, from Long Lake Rd to Quincy St, then paved only north side to east end Gap: No on street striped lanes. Bikes must use sidewalks Co Rd I Yes Yes • Full East/West route: Connects Silver View and Lakeside Parks, Pinewood Elementary • Connection to Shoreview and the TCAAP trailways Plan: Maintain Intermittent paved trailways along both sides of route Gap: Intermittent unpaved portions along both sides Co Rd 10 Yes Yes • Full East/West route: Connects city civic area, retail business parks, high density and senior housing Plan: Pursue grants and use of annual budgeted trailway funds Concrete sidewalk, north side, from west end across CR 10 to Jackson Dr. Continues as 4-5’ lane, both sides, to east end MSA route along majority of length Gaps: No walkway on south side between Silver Lake Rd and Long Lake Rd. Bikes must use sidewalks Co Rd H2 Yes Yes • Full East/West route: Connects Silver View Park and through industrial park Plan: Consider walkway by townhomes Concrete sidewalk, north side, from west end to Silver Lake Rd. Sidewalk continues, south (New Brighton) side, from Silver Lake Rd to Edgewood Dr, then transitions to paved trailway to Old Hwy 8 Gap: No south side walkway from Silver Lake Rd to Edgewood Dr. No controlled walk/bike features from Old Hwy 8 to east end (35W) Co Rd H Yes Yes • Full East/West route: Connects Edgewood MS, Irondale HS, Sunnyside Elementary • Connection to Rice Creek and the TCAAP trailway Plan: Implement with local street and Co Rd H and 10 intersection projects
The URL can be used to link to this page
Your browser does not support the video tag.