My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01-26-2012 Agenda and Packet
MoundsView
>
Commissions
>
Parks, Recreation & Forestry Commission
>
Agenda Packets
>
2010-2019
>
2012
>
01-26-2012 Agenda and Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/10/2024 2:10:50 PM
Creation date
4/1/2020 10:56:05 AM
Metadata
Fields
Template:
MV Parks, Recreation & Forestry Commission
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Trailway System Plan - DRAFT 4 Park Trailways Bike- way Walk- way Connecting Landmarks and Trailways Status – Gaps - Plans Complete – Paved Gap: NA Silver View Park Yes Yes • Connects with Long Lake Rd, Silver Lake Rd, CR H and I trailways Plan: Maintain Trailway is a mix of paved and gravel Gap: Gravel portions not conducive to biking. Bridges need attention. Greenfield Park Yes Yes • Connects with Hillview Rd and Quincy St trailways and Oakwood Park Plan: Pave complete trail and repair/replace bridges. Add bridge to Laport Future – Walkway from Edgewood Dr along sound wall, behind park, to Long Lake Rd Gap: Does not exist Arden Park No Yes • Connect with Long Lake Rd and Arden Ave trailway • Connection with Blaine trailway along CR J/ 85th Ave Plan: Future implementation of gravel or paved walkway Complete – Gravel Gap: NA Woodcrest Park No Yes • Connect with Silver Lake Rd trailway Plan: Maintain
The URL can be used to link to this page
Your browser does not support the video tag.