Laserfiche WebLink
Trailway System Plan - DRAFT 4 Park Trailways Bike- way Walk- way Connecting Landmarks and Trailways Status – Gaps - Plans Complete – Paved Gap: NA Silver View Park Yes Yes • Connects with Long Lake Rd, Silver Lake Rd, CR H and I trailways Plan: Maintain Trailway is a mix of paved and gravel Gap: Gravel portions not conducive to biking. Bridges need attention. Greenfield Park Yes Yes • Connects with Hillview Rd and Quincy St trailways and Oakwood Park Plan: Pave complete trail and repair/replace bridges. Add bridge to Laport Future – Walkway from Edgewood Dr along sound wall, behind park, to Long Lake Rd Gap: Does not exist Arden Park No Yes • Connect with Long Lake Rd and Arden Ave trailway • Connection with Blaine trailway along CR J/ 85th Ave Plan: Future implementation of gravel or paved walkway Complete – Gravel Gap: NA Woodcrest Park No Yes • Connect with Silver Lake Rd trailway Plan: Maintain