My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03-22-2012 Agenda and Packet
MoundsView
>
Commissions
>
Parks, Recreation & Forestry Commission
>
Agenda Packets
>
2010-2019
>
2012
>
03-22-2012 Agenda and Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/10/2024 2:11:11 PM
Creation date
4/1/2020 11:05:53 AM
Metadata
Fields
Template:
MV Parks, Recreation & Forestry Commission
Text box
ID:
1
Creator:
METRO-INET\NYLE.ZIKMUND
Created:
4/1/2020 11:05 AM
Modified:
4/1/2020 11:05 AM
Text:
http://www.ci.mounds-view.mn.us/index.asp?Type=NONE&SEC=%7BE0ABAA84-019C-42B4-B5A4-EEDE1D982C5C%7D
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Trailway System Plan - DRAFT <br />7 <br />North/South <br />Routes <br />Bike- <br />way <br />Walk- <br />way Connecting Landmarks and Regional Trailways Status – Gaps - Plans <br />Groveland Road Yes No • Connects with Groveland Park <br />• Connection with Blaine trailway along CR J/ 85th Ave <br />Striped lanes 4-8’, both sides, from CR 10 to CR J/ 85th Ave. MSA route <br />north of CR 10 <br />Gap: No striped lanes from Bronson to CR10 <br />Plan: Future implementation of trailway with local street project and <br />extension with Knollwood Drive. <br />Silver Lake Road – <br />Red Oak Drive <br />Yes Yes • Full North/South route: Connects Silver View and <br />Woodcrest Parks <br />• Connection with Rice Creek trailway with Long Lake <br />Park and the Mississippi River trailway as destinations <br />• Connection with Blaine trailway along CR J/ 85th Ave <br />Concrete sidewalk, on east side, from CR H, through CR 10, continuing <br />on Red Oak Dr to Hillview Rd. MSA route north of CR 10 (Red Oak Dr) <br />Gap: No controlled walk/bike features from Hillview Rd to Long Lake Rd <br />coinciding with bump outs <br />Plan: Mark trailway on west side <br />Long Lake Road Yes Yes • Full North/South route: Connects Random and Arden <br />Parks and Irondale HS. Connection with Rice Creek, <br />Blaine and New Brighton trailways, and with Long Lake <br />Park and the Mississippi River trailway as destinations <br />Concrete sidewalk, on west side, from south end to Eastwood Dr. On <br />street marked 4’ wide striped lane, both sides, from CR H to CR H2 and <br />CR I to Eastwood <br />Gaps: North end west from Eastwood Dr has no controlled walk/bike <br />features. No striping between CR H2 to CR I <br />Plan: Future implementation with local street project <br />Edgewood Drive Yes Yes • Connects Edgewood MS, City Hall, City Hall Park, Police <br />Station and Community Center <br />Concrete sidewalk, east side, and striped lanes, both sides, from CR H <br />to CR H2. Concrete sidewalk, west side, from CR H2 to CR 10, and both <br />sides from CR 10 to Bronson Ave, changing to striped lanes, both sides, <br />to CR I. MSA route from south border to CR I <br />Gap: No sidewalk north of Bronson. No controlled walk/bike features <br />north of CR I <br />Plan: Future implementation of trailways with local street project <br />Quincy Street Yes Yes • Connects Oakwood and Greenfield Parks, Pinewood <br />Elementary and industrial park <br />Striped lanes, both sides, from CR 10 to Hillview Rd. Concrete <br />sidewalk, on east side, from Hillview Rd to CR H2. MSA route along <br />majority of length <br />Gap: Bikes must use sidewalk <br />Plan: Future implementation of bikeway with local street project <br /> <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.