Laserfiche WebLink
Trailway System Plan - DRAFT <br />7 <br />North/South <br />Routes <br />Bike- <br />way <br />Walk- <br />way Connecting Landmarks and Regional Trailways Status – Gaps - Plans <br />Groveland Road Yes No • Connects with Groveland Park <br />• Connection with Blaine trailway along CR J/ 85th Ave <br />Striped lanes 4-8’, both sides, from CR 10 to CR J/ 85th Ave. MSA route <br />north of CR 10 <br />Gap: No striped lanes from Bronson to CR10 <br />Plan: Future implementation of trailway with local street project and <br />extension with Knollwood Drive. <br />Silver Lake Road – <br />Red Oak Drive <br />Yes Yes • Full North/South route: Connects Silver View and <br />Woodcrest Parks <br />• Connection with Rice Creek trailway with Long Lake <br />Park and the Mississippi River trailway as destinations <br />• Connection with Blaine trailway along CR J/ 85th Ave <br />Concrete sidewalk, on east side, from CR H, through CR 10, continuing <br />on Red Oak Dr to Hillview Rd. MSA route north of CR 10 (Red Oak Dr) <br />Gap: No controlled walk/bike features from Hillview Rd to Long Lake Rd <br />coinciding with bump outs <br />Plan: Mark trailway on west side <br />Long Lake Road Yes Yes • Full North/South route: Connects Random and Arden <br />Parks and Irondale HS. Connection with Rice Creek, <br />Blaine and New Brighton trailways, and with Long Lake <br />Park and the Mississippi River trailway as destinations <br />Concrete sidewalk, on west side, from south end to Eastwood Dr. On <br />street marked 4’ wide striped lane, both sides, from CR H to CR H2 and <br />CR I to Eastwood <br />Gaps: North end west from Eastwood Dr has no controlled walk/bike <br />features. No striping between CR H2 to CR I <br />Plan: Future implementation with local street project <br />Edgewood Drive Yes Yes • Connects Edgewood MS, City Hall, City Hall Park, Police <br />Station and Community Center <br />Concrete sidewalk, east side, and striped lanes, both sides, from CR H <br />to CR H2. Concrete sidewalk, west side, from CR H2 to CR 10, and both <br />sides from CR 10 to Bronson Ave, changing to striped lanes, both sides, <br />to CR I. MSA route from south border to CR I <br />Gap: No sidewalk north of Bronson. No controlled walk/bike features <br />north of CR I <br />Plan: Future implementation of trailways with local street project <br />Quincy Street Yes Yes • Connects Oakwood and Greenfield Parks, Pinewood <br />Elementary and industrial park <br />Striped lanes, both sides, from CR 10 to Hillview Rd. Concrete <br />sidewalk, on east side, from Hillview Rd to CR H2. MSA route along <br />majority of length <br />Gap: Bikes must use sidewalk <br />Plan: Future implementation of bikeway with local street project <br /> <br /> <br /> <br />