My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03-22-2012 Agenda and Packet
MoundsView
>
Commissions
>
Parks, Recreation & Forestry Commission
>
Agenda Packets
>
2010-2019
>
2012
>
03-22-2012 Agenda and Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/10/2024 2:11:11 PM
Creation date
4/1/2020 11:05:53 AM
Metadata
Fields
Template:
MV Parks, Recreation & Forestry Commission
Text box
ID:
1
Creator:
METRO-INET\NYLE.ZIKMUND
Created:
4/1/2020 11:05 AM
Modified:
4/1/2020 11:05 AM
Text:
http://www.ci.mounds-view.mn.us/index.asp?Type=NONE&SEC=%7BE0ABAA84-019C-42B4-B5A4-EEDE1D982C5C%7D
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Trailway System Plan - DRAFT <br />8 <br />East/West Routes <br />Bike- <br />way <br />Walk- <br />way Connecting Landmarks and Regional Trailways Status – Gaps - Plans <br />Co Rd J (85th) No Yes • Full East/West route <br />• Connection to Blaine and Shoreview trailways along CR <br />J/ 85th Ave <br />Sidewalk along north (Blaine) side of route <br />Gap: No controlled walk/bike features along south (Mounds View) side <br />of route <br />Plan: Future implementation of walkway. Obtain right of way from <br />Spring Lake Road to Coral Sea on south side of route <br />Arden Avenue No Yes • Connects with Groveland and Arden Parks On street 4’ wide lane, both sides, from Spring Lake Rd to Eastwood <br />Rd. <br />MSA route <br />Gap: No controlled walk/bike features from Eastwood Rd to Long Lake <br />Rd and limited room for off–street walkway <br />Plan: Future implementation of walkway with local street project. Use <br />MSA funds for walkway <br />Hillview Road No Yes • Connects Hillview and Greenfield Parks On street 4-8’ wide lane, both sides, from Red Oak Dr to east end. <br />MSA route along majority of length <br />Gap: NA <br />Plan: Maintain <br />Co Rd I Yes Yes • Full East/West route: Connects Silver View and <br />Lakeside Parks, Pinewood Elementary <br />• Connection to Shoreview, TCAAP and Fridley trailways <br />Concrete sidewalk, on north side, from west end to Silver Lake Rd. <br />Sidewalk changes to south side from Silver Lake Rd to Long Lake Rd. <br />Sidewalk, both sides, from Long Lake Rd to Quincy St, then paved only <br />north side to east end <br />Gap: No on street striped lanes. Bikes must use sidewalks <br />Plan: Maintain <br />Co Rd 10 Yes Yes • Full East/West route: Connects city civic area, retail <br />business parks, high density and senior housing <br />Intermittent paved trailways along both sides of route <br />Gap: Intermittent unpaved portions along both sides <br />Plan: Pursue grants and use of annual budgeted trailway funds <br />Co Rd H2 Yes Yes • Full East/West route: Connects Silver View Park and <br />through industrial park <br />• Connection to Fridley trailways <br />Concrete X’ wide sidewalk, north side, from west end across CR 10 to <br />Jackson Dr. Continues as 4-5’ lane, both sides, to east end <br />MSA route along majority of length <br />Gaps: No walkway on south side between Silver Lake Rd and Long Lake <br />Rd. Bikes must use sidewalks <br />Plan: Consider walkway by townhomes <br />Co Rd H Yes Yes • Full East/West route: Connection to Edgewood MS, <br />Irondale HS, Sunnyside Elementary <br />• Connection to Rice Creek, TCAAP and Fridley trailways <br />Concrete sidewalk, north side, from west end to Silver Lake Rd. <br />Sidewalk continues, south (New Brighton) side, from Silver Lake Rd to <br />Edgewood Dr, then transitions to paved trailway to Old Hwy 8 <br />Gap: No south side walkway from Silver Lake Rd to Edgewood Dr. No <br />controlled walk/bike features from Old Hwy 8 to east end (35W) or to <br />TCAAP
The URL can be used to link to this page
Your browser does not support the video tag.