Laserfiche WebLink
Trailway System Plan - DRAFT <br />9 <br />Plan: Implement needed features with local street and Co Rd H and 10 <br />intersection projects <br /> <br />Park Trailways Bike- <br />way <br />Walk- <br />way <br />Connecting Landmarks and Trailways Status – Gaps - Plans <br />Silver View Park <br /> <br />Yes Yes • Connects with Long Lake Rd, Silver Lake Rd, CR H and I <br />trailways <br />Complete – Paved <br />Gap: NA <br />Plan: Maintain <br />Greenfield Park <br /> <br />Yes Yes • Connects with Hillview Rd and Quincy St trailways and <br />Oakwood Park <br />Trailway is a mix of paved and gravel <br />Gap: Gravel portions not conducive to biking. Bridges need attention. <br />Plan: Pave complete trail and repair/replace bridges. Add bridge to <br />Laport <br />Arden Park <br /> <br />No Yes • Connect with Long Lake Rd and Arden Ave trailway <br />• Connection with Blaine trailway along CR J/ 85th Ave <br />Future – Walkway from Edgewood Dr along sound wall, behind park, to <br />Long Lake Rd <br />Gap: Does not exist <br />Plan: Future implementation of gravel or paved walkway <br />Woodcrest Park No Yes • Connect with Silver Lake Rd trailway Complete – Gravel <br />Gap: NA <br />Plan: Maintain <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />