My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06-28-2012 Agenda and Packet
MoundsView
>
Commissions
>
Parks, Recreation & Forestry Commission
>
Agenda Packets
>
2010-2019
>
2012
>
06-28-2012 Agenda and Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/10/2024 2:11:37 PM
Creation date
4/1/2020 11:18:08 AM
Metadata
Fields
Template:
MV Parks, Recreation & Forestry Commission
Text box
ID:
1
Creator:
METRO-INET\NYLE.ZIKMUND
Created:
4/1/2020 11:18 AM
Modified:
4/1/2020 11:18 AM
Text:
http://www.ci.mounds-view.mn.us/index.asp?Type=NONE&SEC=%7BE0ABAA84-019C-42B4-B5A4-EEDE1D982C5C%7D
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Trailway System Plan – DRAFT April 2012 <br />8 <br />Quincy Street Yes Yes • Connects Oakwood and Greenfield Parks, <br />Pinewood Elementary and industrial park <br />Striped 6-10’ lanes, both sides, from CR 10 to CR I. Concrete sidewalk, on <br />east side, from Hillview Rd to CR H2. MSA route along majority of length <br />Gap: No sidewalk from CR 10 to CR H2 <br />Plan: Future implementation of sidewalk with local street project <br /> <br /> <br /> <br />East/West Routes <br />Bike- <br />way <br />Walk- <br />way Connecting Landmarks and Regional Trailways Status – Gaps - Plans <br />Co Rd J (85th) No Yes • Full East/West route <br />• Connection to Blaine and Shoreview trailways <br />along CR J/ 85th Ave <br />Sidewalk along north (Blaine) side of route <br />Gap: No controlled walk/bike features along south (Mounds View) side of <br />route <br />Plan: Future implementation of walkway. Obtain right of way from Spring <br />Lake Road to Coral Sea on south side of route <br />Arden Avenue No Yes • Connects with Groveland and Arden Parks On street 4-6’ wide lane, both sides, from Spring Lake Rd to Eastwood <br />Rd.MSA route <br />Gap: No controlled walk/bike features from Eastwood Rd to Long Lake Rd <br />and limited room for off–street walkway <br />Plan: Future implementation of walkway with local street project. Use MSA <br />funds for walkway <br />Hillview Road Yes Yes • Connects Hillview and Greenfield Parks On street 4-8’ wide lane, both sides, from Red Oak Dr to east end. MSA <br />route along majority of length <br />Gap: NA <br />Plan: Maintain existing. <br />Co Rd I Yes Yes • Full East/West route: Connects Silver View and <br />Lakeside Parks, Pinewood Elementary <br />• Connection to Shoreview, TCAAP and Fridley <br />trailways <br /> Sidewalk, on north side, from west end to Silver Lake Rd. Sidewalk changes <br />to south side from Silver Lake Rd to Long Lake Rd. Sidewalk, both sides, <br />from Long Lake Rd to Quincy St, then paved only north side to east end <br />Gap: No on street striped lanes. Bikes must use sidewalks. Poor trailway <br />intersectionat CR 10 <br />Plan: Maintain existing. Improve CR 10 intersection <br />Co Rd 10 Yes Yes • Full East/West route: Connects city civic area, <br />retail business parks, high density and senior <br />housing <br />Intermittent paved trailways along both sides of route <br />Gap: Intermittent unpaved sections along both sides <br />Plan: Pursue grants and use of annual budgeted trailway funds to complete <br />trailways on both sides of CR10 <br />Co Rd H2 Yes Yes • Full East/West route: Connects Silver View Park Concrete 8’ sidewalk, north side, from west end across CR 10 to Jackson Dr. <br />Deleted: Bikes must use sidewalk
The URL can be used to link to this page
Your browser does not support the video tag.