My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06-28-2012 Agenda and Packet
MoundsView
>
Commissions
>
Parks, Recreation & Forestry Commission
>
Agenda Packets
>
2010-2019
>
2012
>
06-28-2012 Agenda and Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/10/2024 2:11:37 PM
Creation date
4/1/2020 11:18:08 AM
Metadata
Fields
Template:
MV Parks, Recreation & Forestry Commission
Text box
ID:
1
Creator:
METRO-INET\NYLE.ZIKMUND
Created:
4/1/2020 11:18 AM
Modified:
4/1/2020 11:18 AM
Text:
http://www.ci.mounds-view.mn.us/index.asp?Type=NONE&SEC=%7BE0ABAA84-019C-42B4-B5A4-EEDE1D982C5C%7D
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Trailway System Plan – DRAFT April 2012 <br />9 <br />and through industrial park <br />• Connection to Fridley trailways <br />Continues as 4-5’ lane, both sides, to east end <br />MSA route along majority of length <br />Gaps: No walkway on south side between Silver Lake Rd and Long Lake Rd. <br />Bikes must use sidewalks <br />Plan: Consider walkway by townhomes <br />Co Rd H Yes Yes • Full East/West route: Connection to Edgewood <br />MS, Irondale HS, Sunnyside Elementary <br />• Connection to Rice Creek, TCAAP and Fridley <br />trailways <br />Concrete sidewalk, north side, from west end to Silver Lake Rd. Sidewalk <br />continues, south (New Brighton) side, from Silver Lake Rd to Edgewood Dr, <br />then transitions to paved trailway to Old Hwy 8 <br />Gap: No south side walkway from Silver Lake Rd to Edgewood Dr. No <br />controlled walk/bike features from Old Hwy 8 to east end (35W) or to TCAAP <br />Plan: Implement needed features with local street and Co Rd H and 10 <br />intersection projects <br /> <br />Park Trailways Bike- <br />way <br />Walk- <br />way <br />Connecting Landmarks and Trailways Status – Gaps - Plans <br />Silver View Park <br /> <br />Yes Yes • Connects with Long Lake Rd, Silver Lake Rd, CR H <br />and I trailways <br />Complete – Paved <br />Gap: NA <br />Plan: Maintain <br />Greenfield Park <br /> <br />Yes Yes • Connects with Hillview Rd and Quincy St trailways <br />and Oakwood Park <br />Trailway is a mix of paved and gravel <br />Gap: Gravel portions not conducive to biking. Bridges need attention. <br />Plan: Pave complete trail and repair/replace bridges. Add bridge to Laport <br />Arden Park <br /> <br />No Yes • Connect with Long Lake Rd and Arden Ave <br />trailway <br />• Connection with Blaine trailway along CR J/ 85th <br />Ave <br />Future – Walkway from Edgewood Dr along sound wall, behind park, to Long <br />Lake Rd <br />Gap: Does not exist <br />Plan: Future implementation of gravel or paved walkway <br />Woodcrest Park No Yes • Connect with Silver Lake Rd trailway Complete – Gravel <br />Gap: NA <br />Plan: Maintain <br /> <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.