My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06-28-2012 Agenda and Packet
MoundsView
>
Commissions
>
Parks, Recreation & Forestry Commission
>
Agenda Packets
>
2010-2019
>
2012
>
06-28-2012 Agenda and Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/10/2024 2:11:37 PM
Creation date
4/1/2020 11:18:08 AM
Metadata
Fields
Template:
MV Parks, Recreation & Forestry Commission
Text box
ID:
1
Creator:
METRO-INET\NYLE.ZIKMUND
Created:
4/1/2020 11:18 AM
Modified:
4/1/2020 11:18 AM
Text:
http://www.ci.mounds-view.mn.us/index.asp?Type=NONE&SEC=%7BE0ABAA84-019C-42B4-B5A4-EEDE1D982C5C%7D
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Trailway System Plan – DRAFT April 2012 <br />10 <br />Connector <br />Trailways <br />Bike- <br />way <br />Walk- <br />way Connecting Landmarks and Trailways Status – Gaps - Plans <br />Pleasant View Court <br />to Spring Lake Road <br />Yes Yes • Connects to Arden Ave trailway and neighborhoods <br /> <br />Complete – Paved <br />Gap: NA <br />Plan: Maintain <br />Arden Ave to Laport <br />Drive <br />Yes Yes • Connects Groveland Park, Arden Ave trailway to <br />neighborhoods <br />Complete – Paved <br />Gap: NA <br />Plan: Maintain <br />Arden Avenue to <br />Sherwood <br />Yes Yes • Connect Arden Ave trailway to neighborhoods Currently a worn foot path <br />Gap: Does not exist <br />Plan: Future implementation of paved trailway <br />Lois Lane to Knoll <br />Drive <br />Yes Yes • Connects neighborhoods Complete – Paved <br />Gap: NA <br />Plan: Maintain <br />Hidden Hollow South <br />to Hidden Hollow <br />North <br />Yes Yes • Connect CR H and H2 trailways and neighborhoods Currently a worn foot path <br />Gap: Does not exist <br />Plan: Future implementation of paved trailway <br />Edgewood Drive to <br />Bona Road <br />Yes Yes • Connects Edgewood MS, Edgewood Dr trailway to <br />neighborhoods <br />Complete – Paved <br />Gap: NA <br />Plan: Maintain <br />Edgewood Drive - <br />North of CR I to <br />Hillview Rd <br />Yes Yes • Connect Edgewood Dr through wooded area between <br />CR I and Hillview Rd <br />Currently a worn foot path <br />Gap: Trailway does not exist <br />Plan: Future implementation of paved trailway <br /> <br /> <br />Fill the Gaps Priorities <br />Short Term: <br />• Complete CR H walkway (sidewalk) between Edgewood Drive and Silver Lake Road. Coordinate with area street construction project in area. <br />Medium Term: <br />• Complete CR 10 trailways (North and South sides) <br />• Complete Long Lake Rd trailway along north end to CR J/ 85th Ave and to Groveland Rd <br />• Continuation of existing walkways along main E/W and N/S routes. <br /> <br />Must define purpose of striped lanes or acceptable uses, and if bike use of sidewalks is acceptable. <br />Deleted: Future (Need Input) <br />Deleted: Future - <br />Deleted: Co Rd H2 to Co Rd 10 <br />Formatted: None, Indent: Left: -0.01", Hanging: 0.13", <br />Space Before: 0 pt, After: 0 pt, Line spacing: single, Don't <br />keep with next, Don't keep lines together <br />Deleted: to CR 10 trailway past theater <br />Deleted: Complete off-set trailway through theater parking lot <br />Deleted: NA <br />Deleted: Maintain <br />Deleted: <br />Deleted: at <br />Deleted: (North County Line)
The URL can be used to link to this page
Your browser does not support the video tag.