My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02-28-2013 Agenda and Packet
MoundsView
>
Commissions
>
Parks, Recreation & Forestry Commission
>
Agenda Packets
>
2010-2019
>
2013
>
02-28-2013 Agenda and Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/10/2024 2:48:38 PM
Creation date
4/2/2020 5:52:29 AM
Metadata
Fields
Template:
MV Parks, Recreation & Forestry Commission
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Trailways System Master Plan - DRAFT 9 Detailed Plan – Continued North/South Routes Use Prior-ity Connecting Landmarks and Regional Trailways Status – Gaps - Plans Spring Lake Road SU • Connection with Lakeside Park • Connection with Blaine trailway along CR J/ 85th Ave Striped lanes 2’, on east side, from CR H2 to CR J/ 85th Ave. MSA route north of CR 10, and south of CR H2 Gap: No controlled walk/bike features along entire length Plan: Implement walk/bike features along entire length Silver Lake Road – Red Oak Drive SU • Full North/South route: Connects Silver View and Woodcrest Parks • Connection with Rice Creek trailway with Long Lake Park and the Mississippi River trailway as destinations • Connection with Blaine trailway along CR J/ 85th Ave Concrete sidewalk, on east side, from CR H, through CR 10, continuing on Red Oak Dr to Hillview Rd. MSA route north of CR 10 (Red Oak Dr) Gap: No controlled walk/bike features from Hillview Rd to Long Lake Rd coinciding with bump outs Plan: Mark trailway on west side Long Lake Road SU 1 • Full North/South route: Connects Random and Arden Parks and Irondale HS. Connection with Rice Creek, Blaine and New Brighton trailways, and with Long Lake Park and the Mississippi River trailway as destinations Concrete sidewalk, on west side, from south end to Eastwood Dr. On street marked 4’ wide striped lane, both sides, from CR H to CR H2 and CR I to Eastwood Gaps: North end west from Eastwood Dr to Groveland Rd has no controlled walk/bike features. No striping between CR H2 to CR I Plan: Future extension of trailway with local street project Edgewood Drive SU • Connects Edgewood MS, City Hall, City Hall Park, Police Station and Community Center Concrete sidewalk, east side, and 6’ striped lanes, both sides, from CR H to CR H2. Concrete sidewalk, west side, from CR H to CR 10, and both sides from CR 10 to Bronson Ave, changing to striped lanes, both sides, to CR I. MSA route from south border to CR I Gap: No sidewalk north of Bronson. No controlled walk/bike features north of CR Plan: Future improvement of trailway with local street project and addition of formal trailway through wooded area between CR I and Hillview Rd Quincy Street SU • Connects Oakwood and Greenfield Parks, Pinewood Elementary and industrial park Striped 6-10’ lanes, both sides, from CR 10 to CR I. Concrete sidewalk, on east side, from Hillview Rd to CR H2. MSA route along majority of length Gap: No sidewalk from CR 10 to CR H2 Plan: Future implementation of sidewalk with local street project Old Hwy 8 SU • Connects CR H to New Brighton trailway to Long Lake Park Concrete sidewalk, west side, from CR H to south boarder Gap: NA Plan: NA
The URL can be used to link to this page
Your browser does not support the video tag.