My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02-28-2013 Agenda and Packet
MoundsView
>
Commissions
>
Parks, Recreation & Forestry Commission
>
Agenda Packets
>
2010-2019
>
2013
>
02-28-2013 Agenda and Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/10/2024 2:48:38 PM
Creation date
4/2/2020 5:52:29 AM
Metadata
Fields
Template:
MV Parks, Recreation & Forestry Commission
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Trailways System Master Plan - DRAFT 10 Detailed Plan – Continued East/West Routes Use Prior-ity Connecting Landmarks and Regional Trailways Status – Gaps - Plans Co Rd J (85th) WW • Full East/West route • Connection to Blaine and Shoreview trailways along CR J/ 85th Ave Sidewalk along north (Blaine) side of route Gap: No controlled walk/bike features along south (Mounds View) side of route Plan: Future implementation of walkway. Obtain right of way from Spring Lake Road to Coral Sea on south side of route Arden Avenue WW • Connects with Groveland and Arden Parks On street 4-6’ wide lane, both sides, from Spring Lake Rd to Eastwood Rd.MSA route Gap: No controlled walk/bike features from Eastwood Rd to Long Lake Rd and limited room for off–street walkway Plan: Future implementation of walkway with local street project. Use MSA funds for walkway Hillview Road SU • Connects Hillview and Greenfield Parks On street 4-8’ wide lane, both sides, from Red Oak Dr to east end. MSA route along majority of length Gap: NA Plan: Maintain existing. Co Rd I SU 1 • Full East/West route: Connects Silver View and Lakeside Parks and Pinewood Elementary, including connection to Shoreview, TCAAP and Fridley trailways • The stretch near CR10 passes senior and assisted living facilities and commercial sites Sidewalk, on north side, from west end to Silver Lake Rd. Sidewalk changes to south side from Silver Lake Rd to Long Lake Rd. Sidewalk, both sides, from Long Lake Rd to Quincy St, then paved only north side to east end Gap: No on street striped biking lanes requiring bikes to use sidewalks. Sidewalk only on south side from Silver Lake Road to Long Lake Road crossing CR 10. Plan: Maintain existing. Improve CR 10 intersection Co Rd 10 SU 1 • Full East/West route: Connects city civic area, retail business parks, high density and senior housing Intermittent paved trailways along both sides of route Gap: Intermittent unpaved sections along both sides Plan: Pursue grants and use of annual budgeted trailway funds to complete trailways on both sides of CR10 Co Rd H2 SU • Full East/West route: Connects Silver View Park and through industrial park • Connection to Fridley trailways Concrete 8’ sidewalk, north side, from west end across CR 10 to Jackson Dr. Continues as 4-5’ lane, both sides, to east end MSA route along majority of length Gaps: No walkway on south side between Silver Lake Rd and Long Lake Rd. Bikes must use sidewalks Plan: Consider walkway by townhomes
The URL can be used to link to this page
Your browser does not support the video tag.