My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02-28-2013 Agenda and Packet
MoundsView
>
Commissions
>
Parks, Recreation & Forestry Commission
>
Agenda Packets
>
2010-2019
>
2013
>
02-28-2013 Agenda and Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/10/2024 2:48:38 PM
Creation date
4/2/2020 5:52:29 AM
Metadata
Fields
Template:
MV Parks, Recreation & Forestry Commission
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Trailways System Master Plan - DRAFT 11 Co Rd H SU 1 • Full East/West route: Connection to Edgewood MS, Irondale HS, Sunnyside Elementary • Connection to Rice Creek, TCAAP and Fridley trailways Concrete sidewalk, north side, from west end to Silver Lake Rd. Sidewalk continues, south (New Brighton) side, from Silver Lake Rd to Edgewood Dr, then transitions to paved trailway to Old Hwy 8 Gap: No south side walkway from Silver Lake Rd to Edgewood Dr. No controlled walk/bike features from Old Hwy 8 to east end (35W) or to TCAAP Plan: Implement needed features with local street and Co Rd H and 10 intersection projects Detailed Plan - Continued Park Trailways Use Prior-ity Connecting Landmarks and Trailways Status – Gaps - Plans Silver View Park SU • Connects with Long Lake Rd, Silver Lake Rd, CR H and I trailways Complete – Paved Gap: NA Plan: Replace /Repair Greenfield Park WW • Connects with Hillview Rd and Quincy St trailways and Oakwood Park Trailway is a mix of paved and gravel Gap: Gravel portions not conducive to biking. Bridges need attention. Plan: Pave complete trail and repair/replace bridges. Add bridge to Laport and Sherwood Rd Arden Park WW • Connect with Long Lake Rd and Arden Ave Edgewood Rd trailways • Connection with Blaine trailway along CR J/ 85th Ave Walkway exists from Long Lake Road along sound wall, through park and back to Long Lake Rd Gap: Minor improvements needed to encourage use Plan: Future improvement to gravel or implement paved walkway Woodcrest Park WW • Connect with Silver Lake Rd trailway Complete – Gravel Gap: NA Plan: Maintain
The URL can be used to link to this page
Your browser does not support the video tag.