Laserfiche WebLink
Trailways System Master Plan - DRAFT 11 Co Rd H SU 1 • Full East/West route: Connection to Edgewood MS, Irondale HS, Sunnyside Elementary • Connection to Rice Creek, TCAAP and Fridley trailways Concrete sidewalk, north side, from west end to Silver Lake Rd. Sidewalk continues, south (New Brighton) side, from Silver Lake Rd to Edgewood Dr, then transitions to paved trailway to Old Hwy 8 Gap: No south side walkway from Silver Lake Rd to Edgewood Dr. No controlled walk/bike features from Old Hwy 8 to east end (35W) or to TCAAP Plan: Implement needed features with local street and Co Rd H and 10 intersection projects Detailed Plan - Continued Park Trailways Use Prior-ity Connecting Landmarks and Trailways Status – Gaps - Plans Silver View Park SU • Connects with Long Lake Rd, Silver Lake Rd, CR H and I trailways Complete – Paved Gap: NA Plan: Replace /Repair Greenfield Park WW • Connects with Hillview Rd and Quincy St trailways and Oakwood Park Trailway is a mix of paved and gravel Gap: Gravel portions not conducive to biking. Bridges need attention. Plan: Pave complete trail and repair/replace bridges. Add bridge to Laport and Sherwood Rd Arden Park WW • Connect with Long Lake Rd and Arden Ave Edgewood Rd trailways • Connection with Blaine trailway along CR J/ 85th Ave Walkway exists from Long Lake Road along sound wall, through park and back to Long Lake Rd Gap: Minor improvements needed to encourage use Plan: Future improvement to gravel or implement paved walkway Woodcrest Park WW • Connect with Silver Lake Rd trailway Complete – Gravel Gap: NA Plan: Maintain