My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07-24-2014 Agenda and Packet
MoundsView
>
Commissions
>
Parks, Recreation & Forestry Commission
>
Agenda Packets
>
2010-2019
>
2014
>
07-24-2014 Agenda and Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/10/2024 2:52:34 PM
Creation date
4/2/2020 6:23:44 AM
Metadata
Fields
Template:
MV Parks, Recreation & Forestry Commission
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Item No. 7A <br />M E M O R A N D U M <br />To: Parks & Recreation & Forestry Commissioners <br />From: Don Peterson – Public Works Supervisor <br />Date: July 24, 2014 <br />RE: Discuss Groveland Park Improvements <br />The Commission has been planning for construction of park improvements at Groveland Park for next year <br />(2015). This schedule will coincide with the street construction planned for Groveland Park’s neighborhood. <br />The Commission and Public Works staff toured Groveland Park in May 2014 and discussed ideas for <br />potential improvements. The following is a synopsis of the potential improvements with estimated <br />construction costs that were discussed. Recommendations made by the Commission during the tour are <br />shown in red. <br />Groveland Park Improvements <br />1) Warming House <br />a) New Furniture <br />i. New tables inside to match Lambert Park - estimated cost $(staff is working on <br />quotes) <br />b) Painting on interior (Same color as Hillview) <br />i. Paint interior to match Hillview interior, stain windows -estimated cost $ 200 <br />c) New Floor, tile or rubberized <br />i. Place carpet on the interior, use carpet squares estimated cost $(staff is getting <br />quote) <br />d) Exterior concrete sidewalk around the building, straight edge or rounded for plantings <br />i. Place concrete around building and place two new picnic tables estimated cost $ <br />3,664 <br /> <br />2) Drinking Fountain – leave as is or move to a unit mounted on the building? <br />a) The decision was leave in place and paint – estimated cost $250 <br /> <br />3) Park Sign – locations, move or leave in place? <br />a) The decision was to relocate sign and place next to the sidewalk leading to the building <br />estimated cost $750 <br /> <br />4) Irrigation – the entire park? <br />a) Irrigation to be placed around the Park Building, playground, ball field, tennis and <br />basketball courts estimated cost $ 45,000 <br /> <br />5) Remove old hockey rink lights? Could be re-installed for lighting volleyball courts? <br />a) Take lights down leave poles in place for future needs. Estimated cost $ 1,500 <br /> <br />6) Move portable rest room location avoiding service truck from driving in park <br />a) Move to new location and build new screen, estimated cost $ (staff has additional <br />questions) <br /> <br />7) Small knoll by playground with benches, remove and flatten? <br />a) Leave knoll in place, replace benches, estimated cost $1,236
The URL can be used to link to this page
Your browser does not support the video tag.