Laserfiche WebLink
Discuss Groveland Park Improvements <br />2/3 <br />8) Playground <br />a) Remove punched steel flooring <br />i. Check with manufacture to see if this can be done (note if the playground structure <br />is changed it will need to be brought up to meet ADA compliance, staff is currently <br />working with a contractor to get costs to re-furbish the entire playground) <br />b) Install reversed curbing around entire playground <br />i. Move forward and install estimated cost $ (contractor to perform during street <br />construction) <br />c) New swing set <br />i. Get a replacement cost combine with toddler swing estimated cost $2,517 <br />d) New toddler swings <br />i. See above <br />e) Remove sand in playground, replace with woodchips <br />i. Replace in 2015 estimated cost for wood fiber $3,990 <br />f) Install drain field inside playground <br />i. To be done with woodchips estimated cost $ 475.25 <br />g) Replace toddler play area <br />i. Get prices from vendor new toddler play area $16,027 <br /> <br />9) Ball Park <br />a) Bring infield down to regulation size <br />i. Yes move forward on this – estimated cost $ staff time, no material <br />b) Grade outfield <br />i. Yes move forward on this – estimated cost $ (contractor can perform during street <br />construction) <br />c) New Player benches <br />i. Estimated cost $ 1,408 <br />d) New player area fenced in <br />i. Can it be move to the inside of the ball field? No <br />ii. estimated for player area fenced in (concrete to be poured during street <br />construction) $2,500 <br /> <br />10) Volleyball Court <br />a) Move to West side of warming house <br />b) Install revisable curbing <br />c) Install new poles and nets <br />d) Install / move lights - for light playing area <br />i. At first all the Commissioners agreed that moving the volleyball court to the West <br />side of the park building. As further discussions continued throughout the evening, <br />the decision was to remove the Volley Ball Court and not replace it. It was also <br />decided to make the current volley ball court and the West side of the building more <br />green space to be used by people renting out the building for lawn games and other <br />activities. <br />