My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09-25-2014 Agenda and Packet
MoundsView
>
Commissions
>
Parks, Recreation & Forestry Commission
>
Agenda Packets
>
2010-2019
>
2014
>
09-25-2014 Agenda and Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/10/2024 2:54:26 PM
Creation date
4/2/2020 6:36:59 AM
Metadata
Fields
Template:
MV Parks, Recreation & Forestry Commission
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Public Works Staff Report <br />2/3 <br />laying out a new course. Due to the wet early summer and heavy tree cover, this project has been <br />delayed. Progress will be made in October with the hopes to have a proposed layout for Commission <br />review. Tree removal and clearing would occur in late fall/winter. <br />• Reconstruct Trailways: Involves reconstruction of the asphalt trails with an engineering pavement section <br />and grading/drainage corrections. Will require professional engineering services and obtaining permanent <br />trailway easements from Scottland Green apartments. 2014 Budget: $200,000 (Spec. Projects Fund). This <br />project has been deferred to a 2015 construction schedule due to other unexpected expenditures from the <br />Special Projects Fund. An engineering consultant will prepare construction documents for a public bid <br />during winter 2014/2015. Soil borings were completed in September. <br />• Shelter Building Improvements: Involves replacing west side roof gable sheeting and interior improvements <br />to the floor, lighting, and other miscellaneous repairs and upgrades. 2014 Budget: $10,000 (PDF) + $3,500 <br />(General Fund). Residing of gable end on west side of shelter is complete. <br />• Replace Shelter Picnic Tables and Amenities: Remove original six bench tables and replace with an <br />equivalent number of square picnic tables of like kind installed at Lambert Park. Also replace trash <br />containers and install bike racks, benches, etc. at various locations. Public Works received 30+ free new <br />recycling containers from Ramsey County which will be situated next to each trash container. 2014 <br />Budget: $10,000 (PDF) + $5,600 BBC contribution (PDF) for use at various other parks as well. Nine new <br />picnic tables and two grills were ordered and will be installed in early October by Public Works staff. The <br />new layout will have a seating capacity of 70 versus the existing seating capacity of 48. <br />• Irrigation Improvements: Expand irrigation system to cover various locations including around shelter and <br />new playground. 2014 Budget: $10,000 (PDF). The main irrigation underground control vault will also be <br />replaced with an above ground control. 2014 Budget: $5,000 (General Fund). Obtaining quotes from <br />contractors. <br />Random Park <br />• Replace Interior Furniture: Replace tables and chairs with new. 2014 Budget: $3,000 (PDF) – which is <br />funded entirely by BBC contributions (Nov. 2013). <br />Hillview Park <br />• Reroof Shelter: Replace asphalt shingle roof with new. This was originally budgeted for 2013 and unable <br />to be completed prior to winter. Estimated cost is $8,500 which could be covered with 2014 budget <br />under-runs or by amending the adopted budget. BBC donation of $1,785 (Feb. 2014). Received three <br />quotes on 8/21 ranging from $7,960 to $12,220. Contract awarded to low quote by Twin City Roofing on <br />8/25. Construction started 9/22 and is scheduled to be completed on 9/26. <br />City Hall Campus <br />• Irrigation & Landscaping Improvements: The front of City Hall is planned to have new landscaping features <br />installed and irrigation system expanded to cover dead spots and the portion of the park between City Hall <br />and County Highway 10 (volley ball area). 2014 Budget: $25,000 (Spec. Projects Fund). Met with <br />landscape architects in July to develop scope of work. <br /> Groveland Park <br />• Tennis/Basketball Court Rehabilitation (Design): Involves evaluation, design, and bidding documents for <br />option selected, to be constructed in 2015. 2014 Budget: $15,000 (PDF). Evaluating scope of work and <br />developing better cost estimates. Obtaining fee proposals for soil borings and pavement <br />recommendation. <br />Trails/Sidewalk <br />• Ardan Avenue (Red Oak to Long Lake Road): The City Council approved the addition of a six-foot sidewalk <br />to the north boulevard of the Ardan Avenue reconstruction in Area G of the street project (2/24). <br />Engineering staff recommended that this be re-evaluated since it was not previously approved with the <br />non-standard street design. A “shared-use” parking lane is included on the south (eastbound) side.
The URL can be used to link to this page
Your browser does not support the video tag.