Public Works Staff Report <br />3/3 <br />• Long Lake Road (Red Oak to Eastwood): This high priority “missing link” is planned to be constructed with <br />the 2014 Area G Street Project. Public Works is soliciting property owner feedback and will recommend a <br />5-foot bike lane and 6-foot concrete sidewalk with barrier curb between. Engineering met with Ramsey <br />County Public Works on 2/20 to discuss improvements. RCPW has issues with the addition of curb and <br />indicated this section of Long Lake Road will be rehabilitated in the next year or two, at which time RCPW <br />will widen out the shoulder to accommodate on-street pedestrian/bicycle traffic. <br />• County Road H Sidewalk (Silver Lake Road to Edgewood Drive): Public Works is pursuing a Safe Routes to <br />School (SRTS) grant to cover 80% of construction costs. This is a competitive grant and the application is <br />due by the end of January 2014. Estimated project costs: $275,000. Grant application submitted – award <br />notices anticipated in June/July 2014. Unsuccessful at obtaining SRTS grant. Project deferred until 2015. <br />• Trailway Maintenance: Public Works is planning to crack seal and seal coat most of the asphalt pavement <br />trailways in Mounds View. Allied Blacktop awarded contract for $23,630 on 7/14. Fog sealing of all city <br />trails except Silver View Park and County Road I (west of Silver Lake Road) was completed in September. <br />Randon Park, City Hall, and Community Center parking lots were also included in the project. <br />Community Center <br />• Masonry Renovation: Tuck point mortar and repair exterior brick and tile walls (includes City Hall <br />building). 2014 Budget: $30,000 (Spec. Projects Fund). Multi-colored tile block will also be painted to <br />create a civic campus “feel” with City Hall. 2014 Budget: $4,500 (Comm. Center Fund). Received three <br />quotes on 9/18 ranging from $47,776 to $54,608. Contract awarded to low quote by MacPherson-Towne <br />Company on 9/22. <br />• Retrocommissioning Improvements (Phase 1): HVAC and energy upgrades. 2014 Budget: $75,000 (Spec. <br />Projects Fund). Retrocommissioning report approved on 3/24/2014. Three (3) roof top units will be <br />replaced in the middle of October, RTU #1, #2 and #8. Repairs have been made to RTU#6as well as the <br />exhaust fans. A new chair rail in the event center was installed this week and Public Works Staff is in the <br />process of painting the entire Event Center. Renaming of the rooms and signage is being worked on for the <br />entire Community Center. A building lighting audit will be done on Friday 9/26/2014. New lighting systems <br />and bulbs will be looked at for the entire building. Carpet in the Event Center will be cleaned in the next <br />two weeks. Staff is continuing to receive quotes for the remodel project for the Community Center and <br />Prep-Kitchen. <br />Greenfield Park <br />• RCWD ARJD#1 Project: Rice Creek Watershed District is planning the re-profiling and repair of Anoka- <br />Ramsey Judicial Ditch No. 1 which runs through Greenfield Park. Also included is Branch No. 5 which is <br />located behind the baseball outfield and crosses below the parking lot entrance. <br />• MCES Sewer Interceptor Project: Metropolitan Council Environmental Services is planning to improve a <br />large diameter sewer pipe at the northwest corner of Quincy and Hillview.