Laserfiche WebLink
Public Works Staff Report <br />2/3 <br />obtaining permanent trailway easements from Scottland Green apartments and Silver <br />Lake Woods Townhome Association <br />• Budget: $150,000 (Spec. Projects Fund). Increased to $452,116.09 based on <br />engineering and construction costs. <br />• Silver View trial pavement was completed Sept. 16, 2016. Northwest Asphalt is <br />working on punch list items and waiting for some concrete sidewalk work to be <br />completed. <br />• Restoration will be competed in spring of 2017 <br />• Project close out to be completed this summer. Inspection of restored areas will be <br />forthcoming. Punch list to be established. <br /> <br />Irrigation Improvements at Silver View: <br />• Scope: Expand the irrigation system to cover various locations including around <br />shelter and new playground. <br />• Budget: $15,000 (Park Dedication Fund). <br />• The main irrigation underground control vault will also be replaced with an above <br />ground control. <br />• Staff has been meeting with contractors and currently obtaining quotes for the work. <br />• No Upgrade at this time. <br /> <br />Random Park: <br />Building Renovation: <br />• Scope: Interior and exterior renovation to repair rotted wood fascia, increase meeting <br />space and improve the overall aesthetics of the building. <br />• Budget: $20,000 (Park Dedication Fund). <br />• Contractor has been scheduled for the upgrade in lighting and new carpet installation <br />• All work has been completed by contractor, interior work is completed, and painting of <br />the exterior will be completed in 2017. <br />• Staff is obtaining quotes for new tables, coat rack has been ordered. <br /> <br />City Hall Campus: <br />Irrigation & Landscaping Improvements: <br />• Scope: The front of City Hall is planned to have new landscaping features installed <br />and irrigation system expanded to cover dead spots and the portion of the park <br />between City Hall and Mounds View Boulevard (County Highway 10) (volley ball area). <br />• Budget: $25,000 (Special Projects Fund). <br />• The CHPTF task force was created and meet to discuss the campus, the task force will <br />be meeting and bring information forward at a future PRF Commission Meeting, To be <br />discussed tonight. <br /> <br />Groveland Park: <br />Tennis/Basketball Court Rehabilitation (Design): <br />• Scope: Evaluation, design, and bidding documents for option selected, to be <br />constructed in 2016. <br />• Budget: $15,000 (Park Dedication Fund). <br />• Staff has received proposal to evaluate all the courts for a total of $3,000. This will be <br />brought forward to the City Council for approval. <br /> <br />Trails/Sidewalk: