Public Works Staff Report <br />3/3 <br />Hillview Road, Quincy Street and Jackson Drive (2016 Street and Utility Improvement Project <br />– Area I) <br />• Scope: Reconstruction of streets and utilities in the northeast quadrant of Mounds <br />View. Sidewalks will be constructed along Hillview, Jackson and Quincy. <br />• Budget: $4.2M (Street Improvement Fund). <br />• Construction is complete for the season. Most of the sidewalk has been constructed <br />except for tie in at Hillview and Quincy which will be completed in 2017. <br />• Construction has begun for 2017. Sidewalk work on Quincy between Hillview and <br />Rustad will likely occur in May as the goal is to complete the project by May 31. <br /> <br />CSAH 10 Trail Segments #6 & #11: <br />• Scope: Construction of trail segments between Red Oak Drive and Groveland Road <br />(Segment #6) and between Woodale Drive and Edgewood Drive (Segment #11). <br />• Budget: $627,000 ($39,300 cost share with Ramsey County) (Street Improvement <br />Fund). <br />• Construction underway. Northwest Asphalt has paved the trails, electrical sub has <br />completed light base and pole installation wiring is nearly complete. Curb cuts and <br />pavement repair at intersections is complete. Anticipate lighting completion in <br />December (dependent upon Xcel timelines). <br />• Contractor working to complete the electrical for trail lights. Tie in locations were <br />changed requiring additional wire and trenching. <br />• Lighting work is completed. Punch list is being compiled and this project will be closed <br />out in the near future. <br /> <br />Greenfield Park: <br />RCWD ARJD#1 Project: Rice Creek Watershed District is planning the re-profiling and repair <br />of Anoka-Ramsey Judicial Ditch No. 1 which runs through Greenfield Park. Also included is <br />Branch No. 5 which is located behind the baseball outfield and crosses below the parking lot <br />entrance. Staff will be meeting with RCWSD to inquire the status of this work. <br />• RCWD has the goal of completing this project this year, but may wait until colder <br />weather for work to commence. <br />• Staff has been trying to get an updated timeline for the project from RCWD. <br />• Staff has discussed <br /> <br />Other: <br />MCES Sewer Interceptor Project: Metropolitan Council Environmental Services is planning to <br />improve a large diameter sewer pipe at the northwest corner of Quincy and Hillview. MCES is <br />finalizing construction plans and have been reviewed by engineering division, comments <br />returned to MCES. MCES still planning on a 2015 project. Some trees have been tagged in <br />order to be transplanted in other City Parks. Project still scheduled to start later this spring. <br />The work on the meter station at the intersection of Quincy and Hillview has been delayed due <br />to heavy rains and flooding in September. Contractor is having to clean out the interceptor <br />again due to heavy sediment deposits in the line. Work will continue through the winter. A <br />December closure of Quincy Street to the north of Hillview is anticipated and is be required to <br />complete. Work in Quincy is concluding and should have only minor impact to the street <br />project. The current contract requirement for substantial completion is late April with a final <br />completion date of late June. The park will be restored to previous conditions.