My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04-27-2017 Packet
MoundsView
>
Commissions
>
Parks, Recreation & Forestry Commission
>
Agenda Packets
>
2010-2019
>
2017
>
04-27-2017 Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/25/2024 1:27:58 PM
Creation date
4/2/2020 3:13:27 PM
Metadata
Fields
Template:
MV Parks, Recreation & Forestry Commission
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Public Works Staff Report <br />3/3 <br />Hillview Road, Quincy Street and Jackson Drive (2016 Street and Utility Improvement Project <br />– Area I) <br />• Scope: Reconstruction of streets and utilities in the northeast quadrant of Mounds <br />View. Sidewalks will be constructed along Hillview, Jackson and Quincy. <br />• Budget: $4.2M (Street Improvement Fund). <br />• Construction is complete for the season. Most of the sidewalk has been constructed <br />except for tie in at Hillview and Quincy which will be completed in 2017. <br />• Construction has begun for 2017. Sidewalk work on Quincy between Hillview and <br />Rustad will likely occur in May as the goal is to complete the project by May 31. <br /> <br />CSAH 10 Trail Segments #6 & #11: <br />• Scope: Construction of trail segments between Red Oak Drive and Groveland Road <br />(Segment #6) and between Woodale Drive and Edgewood Drive (Segment #11). <br />• Budget: $627,000 ($39,300 cost share with Ramsey County) (Street Improvement <br />Fund). <br />• Construction underway. Northwest Asphalt has paved the trails, electrical sub has <br />completed light base and pole installation wiring is nearly complete. Curb cuts and <br />pavement repair at intersections is complete. Anticipate lighting completion in <br />December (dependent upon Xcel timelines). <br />• Contractor working to complete the electrical for trail lights. Tie in locations were <br />changed requiring additional wire and trenching. <br />• Lighting work is completed. Punch list is being compiled and this project will be closed <br />out in the near future. <br /> <br />Greenfield Park: <br />RCWD ARJD#1 Project: Rice Creek Watershed District is planning the re-profiling and repair <br />of Anoka-Ramsey Judicial Ditch No. 1 which runs through Greenfield Park. Also included is <br />Branch No. 5 which is located behind the baseball outfield and crosses below the parking lot <br />entrance. Staff will be meeting with RCWSD to inquire the status of this work. <br />• RCWD has the goal of completing this project this year, but may wait until colder <br />weather for work to commence. <br />• Staff has been trying to get an updated timeline for the project from RCWD. <br />• Staff has discussed <br /> <br />Other: <br />MCES Sewer Interceptor Project: Metropolitan Council Environmental Services is planning to <br />improve a large diameter sewer pipe at the northwest corner of Quincy and Hillview. MCES is <br />finalizing construction plans and have been reviewed by engineering division, comments <br />returned to MCES. MCES still planning on a 2015 project. Some trees have been tagged in <br />order to be transplanted in other City Parks. Project still scheduled to start later this spring. <br />The work on the meter station at the intersection of Quincy and Hillview has been delayed due <br />to heavy rains and flooding in September. Contractor is having to clean out the interceptor <br />again due to heavy sediment deposits in the line. Work will continue through the winter. A <br />December closure of Quincy Street to the north of Hillview is anticipated and is be required to <br />complete. Work in Quincy is concluding and should have only minor impact to the street <br />project. The current contract requirement for substantial completion is late April with a final <br />completion date of late June. The park will be restored to previous conditions.
The URL can be used to link to this page
Your browser does not support the video tag.