My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07/27/1989
MoundsView
>
Commissions
>
Parks, Recreation & Forestry Commission
>
Agenda Packets
>
1980-1989
>
1989
>
07/27/1989
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/13/2020 2:33:46 PM
Creation date
4/13/2020 1:11:11 PM
Metadata
Fields
Template:
MV Parks, Recreation & Forestry Commission
Documnet Type
Packet
Supplemental fields
Date
7/27/1989
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
59
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
-7 - <br />The discussion concluded with residents <br />expressing their appreciation of the <br />Commissions efforts to improve Oakwood <br />Park and their approval of the site plan as <br />reviewed.. <br />A motion was made by Commissioner <br />Stevenson, seconded by Commissioner Silvis <br />to recommend to the City Council the use of <br />current Park Dedication Funds to implement <br />improvements at Oakwood Park. The motion <br />passed unanimously 5 ayes, 0 nayes. <br />SILVER VIEW PARK PATHWAY Director Saarion stated that the installation <br />of the Silver View Park pathway extension <br />would be delayed until fall, 1989. The <br />pathway would take about two weeks to <br />install. Following completion, Forester Rick <br />Wriskey will meet with residents after the <br />pathway extension is complete, to discuss <br />plantings along the pathway for spring, 1990 <br />planting. <br />Director Saarion reviewed the memorandum <br />regarding the Engineer's recommendation for <br />installation of a culvert where the foot bridge <br />is currently in place. <br />She explained that the Engineer feels the <br />culvert would make it possible for <br />maintenance vehicles to cross that area of <br />the pond for better maintenance of the <br />pathway. <br />Director Saarion asked for the Commission's <br />direction on the recommendation. The <br />Commission did not feel that they were able <br />to give direction at this time. <br />Resident Gary Jones asked staff what the <br />costs of the constructing the new pathway <br />were. Staff stated that material costs were <br />approximately $1,400 for an ag lime <br />pathway. Mr. Jones requested the cost of <br />labor. Staff explained that the labor was <br />budgeted in the General Fund and was not <br />figured into the cost. <br />
The URL can be used to link to this page
Your browser does not support the video tag.