Laserfiche WebLink
COMPREHENSIVE SEWER PLAN <br />Infiltration and Inflow (1/1) <br />September 15, 2020 <br />• Conduct plumbing and other inspections during installation and connection to the system <br />Work towards disconnecting prohibited/unused connections to the sewer system <br />Table 5-1 presents a summary of budgeted implementation costs to address 1/1 in the City's system. <br />Table 5-1 — Estimated 1/1 Implementation Costs <br />B <br />v:\1938\active\193804167\reports\2018 csp\submitted to city 9-8-2020\moundsviewcsp_formcesreview_09152020_updateddraft.docx 5.11 <br />