My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packets - 2020/10/12
MoundsView
>
Commissions
>
City Council
>
Agenda Packets
>
2020-2029
>
2020
>
Agenda Packets - 2020/10/12
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2025 4:50:32 PM
Creation date
10/16/2020 2:25:04 PM
Metadata
Fields
Template:
MV Commission Documents
Commission Name
City Council
Commission Doc Type
Agenda Packets
MEETINGDATE
10/12/2020
Supplemental fields
City Council Document Type
City Council Packets
Date
10/12/2020
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
395
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
included in this table should be considered planning -level cost estimates, with more specific cost <br />estimates to be determined as the project or activity approaches. Any implementation projects will need <br />to comply with applicable RCWD and state rules. <br />For capital improvement projects, the City will continue to rely on its detailed 5-year capital improvement <br />planning process to schedule and plan for funding these projects. The City creates its CIP on a five-year <br />basis and will reassess priorities and the implementation schedule annually. For purposes of this LSWMP, <br />the City is planning to spend an estimated $500,000 per year on stormwater system maintenance, <br />upgrades, and retrofits for the period 2022-2028. The activities listed in Table 8.3 will be used as a <br />reference for particular projects and activities specific to surface water management to be included in the <br />capital improvement planning process. Potential funding sources for the activities are listed in Section <br />8.6; no specific mix of funding sources has yet been determined for individual projects. It should be <br />noted that the activities identified in Table 8.3 are listed chronologically by activity category. A number of <br />projects identified as corrective actions in Table 6.3 are for future implementation and are not scheduled <br />within the City's 5-year capital improvement plan, and no cost estimates have yet been developed. These <br />are shown below as post-2028, and costs are to be determined (TBD). <br />Table 8.3 - System Improvement Activities Listed by Activity Category <br />CaActivity Activity tegory <br />-1 <br />Description <br />Startl <br />Cost <br />1 <br />Capital <br />Woodcrest Park <br />Remove sediment from basin and Swale <br />2020 <br />$50,000 <br />Improvement <br />basin/swale restoration <br />and restore channel <br />2 <br />Capital <br />Ardan Avenue channel <br />Remove sediment and restore drainage <br />2020 <br />$50 000 <br />Improvement <br />restoration <br />corridor <br />' <br />3 <br />Capital <br />Silver View Pond <br />Dredge the pond to remove deposited <br />2026 <br />$2.1M <br />Improvement <br />dredging <br />sediment <br />4 <br />Capital <br />Silver View Pond water <br />Install recirculating pump and iron- <br />2028 <br />$100,000 <br />Improvement <br />quality treatment <br />enhanced bench <br />5 <br />Capital <br />Silver View Pond slope <br />Regrade and restore slopes with native <br />Post- <br />TBD <br />Improvement <br />stabilization <br />vegetation <br />2028 <br />6 <br />Capital <br />Groveland Road <br />Construct outlet skimmer structure <br />Post- <br />TBD <br />Improvement <br />wetland outlet skimmer <br />2028 <br />7 <br />Capital <br />Red Oak Court basin <br />Rebuild outlet structure <br />Post- <br />TBD <br />Improvement <br />outlet <br />2028 <br />8 <br />Capital <br />JD1 channel restoration <br />Stabilize channel, modify outlet, evaluate <br />Post- <br />TBD <br />Improvement <br />at Lois Drive <br />need for additional flood storage <br />2028 <br />9 <br />Capital <br />Quincy Street/Hillview <br />Modify inlet structure <br />Post- <br />TBD <br />Improvement <br />Road inlet <br />2028 <br />City of Mounds View 46 <br />Local Surface Water Management Plan Stantec Project No. 193804166 <br />(5 5tantec <br />
The URL can be used to link to this page
Your browser does not support the video tag.