Laserfiche WebLink
CategoryActivity Activity <br />Project <br />Description <br />Est. <br />-11t(l <br />Est <br />10 <br />Capital <br />EW-5 basin <br />Modify outlet structure and provide <br />Post- <br />TBD <br />Improvement <br />improvements <br />additional flood storage <br />2028 <br />11 <br />Capital <br />Longview Drive <br />Lower wetland EOF and add pond outlet <br />Post- <br />TBD <br />Improvement <br />drainage improvements <br />skimmer structure <br />2028 <br />12 <br />Capital <br />Lambert Avenue <br />Implement improvements in accordance <br />Post- <br />TBD <br />Improvement <br />drainage improvements <br />with drainage study <br />2028 <br />Develop detailed City-wide <br />13 <br />MS4 System <br />City-wide H/H modeling <br />hydrologic/hydraulic model to estimate <br />2021 <br />$200,000 <br />Improvement <br />water levels and develop solutions to high <br />water levels <br />14 <br />MS4 Permit <br />Annual NPDES <br />Writing and administering MS4 annual <br />Ongoing <br />g g <br />$5,000 <br />Compliance <br />Reporting <br />reports <br />annually <br />General inspection and maintenance of the <br />City's stormwater management system, <br />15 <br />MS4 Permit <br />General Inspection and <br />including: <br />Biannual street sweeping <br />Ongoing <br />$250,000 <br />Compliance <br />Maintenance Program <br />Ditches and storm sewer <br />annually <br />■ Outfalls and stormwater ponds <br />■ Structural pollution control devices <br />MS4 Permit <br />Complete City staff training in the <br />16 <br />Compliance <br />Complete Staff Training <br />operation, maintenance and inspection of <br />Ongoing <br />annually <br />the City's storm sewer system <br />8.5 POSSIBLE FUTURE IMPLEMENTATION ACTIVITIES <br />These activities generally include coordination efforts with other agencies or potential future activities <br />that have yet to be defined. The future implementation activities identified below are relevant to overall <br />surface water management within the City and should be considered in future Capital Improvement Plan <br />discussions. <br />Future Total Maximum Daily Load (TMDL) Studies <br />As discussed in Section 6.4, there is one waterbody within the City of Mounds View currently identified on <br />the state list of Impaired Waters: Rice Creek (between an unnamed lake and Long Lake and between <br />Long Lake and Locke Lake). In addition, three waterbodies that are outside of the City but receive <br />discharge from the City are also on the state list of Impaired Waters: Long Lake, a downstream stretch of <br />Rice Creek, and the Mississippi River. <br />The City recognizes that the responsibility for completion and implementation of the TMDL studies lies <br />with the primary stakeholders contributing to the impairment. The City intends to cooperate with the <br />City of Mounds View 47 <br />Local Surface Water Management Plan Stantec Project No. 193804166 <br />(3 Stantec <br />