Staff also sent out and RFP for soil borings and pavement analysis of the streets <br />sections being proposed for re -construction. Staff received two proposal as follows: <br />1) Braun Intertec — Proposal Cost of $10,140.00 <br />2) American Engineering and Testing, Inc. (AET) — Proposal Cost of $12,064.00 <br />Residents will once again have the option of the Private Improvement Program, this is <br />the same program that has been offered to residents in all of the street projects. The <br />Private Improvements include widening the width of the driveway apron and replacing <br />the sanitary sewer line from the main to the parcel property line. Residents will also <br />have the option to have CIPP (cured -in -place -pipe) installed rather than replacing the <br />sewer line. <br />All driveway apron widenings must be approved by the Community Development <br />Director. Community Development will also require all non -conforming driveways and <br />aprons to be corrected. <br />Stantec's final street design will be based on Braun Intertec Corporations geotechnical <br />and pavement evaluation report. Stantec has provided a construction estimate of <br />$4,250.000.00, this does not include any water main work, gate valves and sanitary sewer <br />main line repairs, cured in place pipe work (CIPP). <br />Strategic Plan Strategy/Goal: Maintain and Plan for Infrastructure Improvements. <br />Financial Impact: Financial Impact to 2021 Budget a budget adjustment in funding from <br />the Street Improvement CIP-budget would be needed. The current 2021 budget has an <br />estimate of $75,000 for Engineering Pleasant View Dr. <br />Recommendation: Staff recommends the City Council adopt the attached Resolution <br />approving Stantec to begin the preliminary survey, assist with community engagement <br />and the preliminary design on the 2022 -2023 Pavement Rehabilitation Project at a cost <br />of $416,900.00.Staff further recommends the proposal from Braun Intertec Corporation <br />for the pavement analysis of the project area at a cost of $10,140.00. All to be funded <br />from the Street Improvement Fund 485-4470-7050. <br />Respectfully submitted, <br />Don Peterson <br />Director of Public Works/Parks and Recreation <br />The Mounds View Vision <br />A Thriving Desirable Community <br />