Laserfiche WebLink
Public Works Staff Report <br />Hillview Park: <br />• Commission will need to discuss at the August 2020, playground Rehabilitation. <br />• Furnace at Park Shelter has been replaced — condensing still needs to be installed <br />Lambert Park <br />• Inventory of Hockey Rink boards to re -place started. <br />• Commission will need to discuss at the August 2020 Meeting size of the Hockey Rink. <br />Random Park: <br />• Commission will need to discuss at the August 2020, playground Rehabilitation <br />Silver View Park <br />Ramsey County continues to work in re -profiling the draining ditch along County Road I and <br />Silver View Road, located in Silver View Park. <br />Four new pond aerators installed in the Storm Water Pond <br />Woodcrest Park <br />• Working with Stantec Engineering and Ramsey County on some drainage issues in the Park. <br />Application to perform some storm water pond maintenance was submitted top RCWD. <br />• Met with contractor — work will be scheduled for this winter — postponed <br />4 1 P a g e <br />