Laserfiche WebLink
Public Works Staff Report <br />Forestry <br />Staff worked on the following items this last month: <br />• Resident consults <br />• New tree planting care —watering adding wood mulch <br />• Chainsaw grant application was approved <br />• Watering Trees <br />• Planter box maintenance weeding adding new wood mulch <br />• Hazard Tree remediation <br />The following is the List of Parks and projects / maintenance activities ongoing or planned this year. <br />Current updates are in black text, and updates from the previous two month period are in grey. <br />Ardan Park <br />Working with Stantec Engineering on some drainage issues in the Park. Application to perform <br />some storm water pond maintenance was submitted to RCWD. <br />• Work to be scheduled for this winter — postponed at this time, Still working with contractor for a <br />date on completion <br />CRY Hall Campus: <br />New Picnic Shelters are being built, will be ready for next season rental <br />Worked with plumber and vendor to winterize the splash pad. <br />Installation of the New Picnic Tables started <br />Splash Pad <br />• Testing will be in open the Weekend of May 29 <br />• New UV light unit installed on Tuesday 6/22 <br />Groveland Park: <br />• Final Inspection of Punch list items on 10/25/2018 for Tennis/Basket Ball Court <br />Greenfield Park: <br />• Notified by the DNR that corrections to be made to the tennis court gate entrance — ADA <br />accessible. Fencing contractor scheduled for next month Leveled the trail running in the back <br />portion of the Park, added class 5 as needed. <br />• Commission will need to discuss at the August 2020, Green field baseball field. Take out all turf <br />from first and third base line and replace with Ag-lime to the fence. Most all new park <br />construction is going this way with ball fields. This would solve the wet home plate issue and <br />uneven base line issues. <br />• Building has been re -roofed <br />3 1 P a g e <br />