My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packets - 2021/10/25
MoundsView
>
Commissions
>
City Council
>
Agenda Packets
>
2020-2029
>
2021
>
Agenda Packets - 2021/10/25
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2025 4:50:43 PM
Creation date
10/26/2021 9:57:23 AM
Metadata
Fields
Template:
MV Commission Documents
Commission Name
City Council
Commission Doc Type
Agenda Packets
MEETINGDATE
10/25/2021
Supplemental fields
City Council Document Type
Packets
Date
10/25/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
77
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ORDINANCE NO.982 <br />CITY OF MOUNDS VIEW <br />COUNTY OF RAMSEY <br />STATE OF MINNESOTA <br />AN ORDINANCE AMENDING TITLE III, CHAPTER 37, SECTION 37.060(B) AND <br />TITLE IX, CHAPTER 92, SECTION 92.999 OF THE MOUNDS VIEW MUNICIPAL <br />CODE REGARDING PUBLIC IMPROVEMENTS AND PARKS AND RECREATION <br />THE CITY OF MOUNDS VIEW ORDAINS: <br />SECTION 1. The City Council of the City of Mounds View hereby amends Title III, Chapter 37, <br />Section 37.060(B) of the Mounds View Municipal Code by adding the underlined material and <br />deleting the str-ieken material as follows: <br />(B) Methods of reconstruction. <br />(1) General. The following are methods of street reconstruction and rehabilitation, which <br />will be utilized by the city in considering future projects and assessments. It will be noted that <br />the design standard for either reconstruction or rehab will be the current design of the street <br />section. Projects may be constructed to higher designs if warranted and/or approved by the City <br />Council. <br />(2) Improvement type and apportionment of cost. <br />(a) Street reconstruction including curb and gutter. The cost of street reconstruction shall <br />be r-eeover-ed by the adjusted fFeat footage methed. The fFent footage r-a4e shall be detefmined b <br />assessmen4s per- adjusted fFont foot may var-y depending on the tinder -lying zoning of a par -eel. <br />road) shall be assessed for- dividing the project cost by the total nttmber- of adjusted front feet in the projeet area. The <br />equally divided by both sides of the s4eet. This amount shall not exeeed $14.60 per- front foot. <br />recovered on a proiect-by-proiect basis, as determined by the City Council. <br />1. Non -collector street. Residential property owners will may be assessed for the cost <br />of the pavement and base for the front footage side of the property per direction of the City <br />Council, which shall be determined on a project -by -project basis., h;eh sh not exeee' <br />$14.60 per- 4ontage feet. This amount will be adjusted annua4ly by resolution, in aeeer-danee <br />2. Residents requesting curb and gutter. Any required storm sewer and/or installation of <br />sidewalks/trails on a construction project will may be assessed up to 25% of the total cost of the <br />project additions, which will include engineering, additional removals, base and all other <br />associated expenses. All additional project requests shall may be assessed at 25% of the total <br />costs associated with the improvements. Notwithstanding the foregoing, all assessments shall <br />be subject to the special benefit limitation to the extent required by state law. <br />3. Application. One hundred percent of the turn back funds received from the county <br />will be applied to the new construction or pavement cost of the road that was received. The <br />
The URL can be used to link to this page
Your browser does not support the video tag.