Laserfiche WebLink
Municipal Water System Fees (�'"�,, teF 9 <br />Water Availability Charge (WAC), Residential <br />WAC Charge, Commercial/Industrial <br />Residential Water Usage Base Charge <br />Residential Water — 0 to 12,000 gallons <br />Residential Water — 12,000 to 24,000 gallons <br />Residential Water — Over 24,000 gallons <br />Commercial Water Usage Base Charge <br />Commercial Water — 0 to 125,000 gallons <br />Commercial Water — 125,000 to 700,000 gallons <br />Commercial Water— 700,001 to 1,100,000 gallons <br />Commercial Water — Over 1,100,000 gallons <br />Water Quality Testing Charge (State) <br />Water Service Line Repair Insurance Charge <br />Failure to participate or grant access regarding <br />Public Works Ordinance Programs. <br />(Installation/Repair/Inspect/Replace) <br />Utility Bill Late Payment <br />Utility Bill Assessment Search <br />Water Service Connection/Repair/Disconnect <br />Size Less than 4 Inches <br />Water Service Connection/Repair/Disconnect <br />Size Over 4 Inches <br />Water Service Inspection or Reinspection After <br />Hours <br />Manual Water Meter Read <br />Hydrant Meter Deposit <br />Hydrant Meter Rental (One Week Minimum) <br />Water Shut-Off/Turn-On <br />Water Shut-Off/Turn-On (Snowbirds) <br />Water Meter Testing <br />Water Testing <br />Water Meter <br />Water Meter Radio Remote Reading Device <br />Curb Stop — Valve Cover <br />Municipal Sanitary Sewer System Fees (S# <br />1/1 Application Fee — H2OPP Program <br />Sewer Service Availability Charge (SAC) <br />Sewer Usage Rate <br />Sewer Usage Rate <br />Sewer Service Charge, Residential <br />Sewer Service Charge, Commercial/Industrial/ <br />Public Buildings and Churches <br />Sewer Connection/Repair/Disconnect <br />Sewer Unit Charge (New Connection Only) <br />Sewer Inspection or re -inspection after hours. <br />Surface Water Management (SWM) Utility Fees <br />SWM New Construction, R-1 <br />Chapter 52) <br />$500 per unit <br />$1,000 per acre of developable land ($1,000 <br />minimum charge) <br />$ 19.00 20.00 per quarter <br />$ =50 2.60 per 1,000 gallons per quarter <br />$ 2-.7-5 2.86 per 1,000 gallons per quarter <br />$ 0: 8 3.29 per 1,000 gallons per quarter <br />$ 4$09 20.00 per quarter <br />$ 2-.50 2.60 per 1,000 gallons per quarter <br />$ �5 2.86 per 1,000 gallons per quarter <br />$ 3-.92 3.15 per 1,000 gallons per quarter <br />$ 3-48 3.62 per 1,000 gallons per quarter <br />$ 2.43 per connection per quarter <br />$ 8.00 per connection per quarter <br />$150 per connection per quarter <br />10% of delinquent bill amount <br />$10 <br />$100 plus surcharge <br />$150 plus surcharge <br />After hours call -out rate per visit (Minimum 2 hours) <br />After hours call -out rate per visit <br />$2,500 <br />$50 per week <br />$150 per month <br />No charge during normal business hours, otherwise <br />one hour at call -out rate per visit <br />$25 per shut —off <br />$25 per turn -on <br />Call -out rate per visit (Minimum 2 hours) <br />One hour at call -out rate <br />City cost plus 10% administrative fee <br />City cost plus 10% administrative fee <br />City cost plus 10% administrative fee <br />$150 per lateral line <br />$2,485 per Metropolitan Council Environmental <br />Services <br />Per Quarter <br />$344 3.27 per 1,000 gallons water sold per quarte <br />$39.48 41.06-per residential equivalent unit (REU) <br />connection per quarter <br />$96.97 100.85 per REU connection per quarter <br />$100 plus surcharge <br />$150 per connection <br />Call -out rate Der visit (Minimum 2 hours <br />$212 per lot <br />2022 Mounds View Fee Schedule Page 12 of 14 <br />