My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packets - 2021/11/08
MoundsView
>
Commissions
>
City Council
>
Agenda Packets
>
2020-2029
>
2021
>
Agenda Packets - 2021/11/08
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2025 4:50:59 PM
Creation date
11/8/2021 9:33:31 AM
Metadata
Fields
Template:
MV Commission Documents
Commission Name
City Council
Commission Doc Type
Agenda Packets
MEETINGDATE
11/8/2021
Supplemental fields
City Council Document Type
Packets
Date
11/8/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
120
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
SWM New Construction, R-2 <br />$1,038 per acre <br />SWM New Construction, R-3, R-4, R-O <br />$1,500 per acre <br />SWM New Construction, B-1, B-2, B-3, B-4 <br />$1,500 per acre <br />$2,096 per acre <br />$44.00 15.00 per unit per quarter <br />SWM New Construction, 1-1, PUD <br />SWM Utility Rate Charge, R-1 Single Family and R- <br />2 Single and Two Family Residential <br />SWM Utility Rate Charge, R-3 Medium Density <br />Residential <br />$76.55 81.91 per acre per quarter <br />SWM Utility Rate Charge ,R-4 High Density <br />Residential, R-5 Mobile Homes and R-O Residential <br />Office <br />$90.77 97.12 per acre per quarter <br />SWM Utility Rate Charge ,B-1 Neighborhood <br />Business, B-2 Limited Business, B-3 Highway <br />Business and B-4 Regional Business <br />SWM Utility Rate Charge, 1-1 Industrial <br />$449.90127.22 per acre per quarter <br />$92.83 99.33 per acre per quarter <br />SWM Utility Rate Charge, PUD Planned Unit <br />Development <br />$405.28 112.65 per acre per quarter <br />SWM Utility Rate Charge, CRP Conservancy, <br />Recreation and Preservation <br />$44.00 15.00 per acre per quarter <br />SWM Utility Rate Charge, School or Church, Public <br />or Private <br />$42.72 45.71 per acre per quarter <br />Illicit Discharge Fee <br />To be determined by the Public Works Director on a <br />case -by -case scenario. <br />Storm Water Management (The permit fee schedule adopted 08/24/2016 by the Rice Creek Watershed <br />District Board. The fee for a permit is the cumulative total of all individual aspects of a project. Government <br />entities are exempt from the permit fees). <br />Rule C (Storm water Management): <br />Single lot, single family residential projects <br />Home, Accessory Structure, Driveway, <br />Etc. <br />150 <br />Residential Commercial Industrial Institutional Development <br /><1 acre of new or reconstruction <br />impervious surface <br />$1,000 <br />1-2.5 acres of new or reconstructed <br />impervious surface <br />$2,000 <br />2.5-5 acres of new or reconstructed <br />impervious surface <br />$3,500 <br />>5 acres of new or reconstructed <br />impervious surface <br />$5,000 plus $1,000 per acre (capped at $10,000) <br />Rule D Erosion Control Plans <br /><2.5 acres of land disturbance <br />100 <br />2.5-10 acres of land disturbance <br />IL50 <br />>10 acres of land disturbance <br />$500 <br />Rule E Flood lain Alteration <br />No mitigation required <br />No fee <br />Mitigation re uired <br />100 <br />Rule F Wetland Alteration <br />Exemption <br />250 <br />< 1 acre of mitigation required <br />875 <br />1-5 acres of mitigation required <br />$1,750 <br />5-10 acres of mitigation required <br />13,500 <br />>10 acres <br />$5,250, <br />Banking Plan <br />$1,750 <br />Rule G (Regional Conveyance Systems): <br />500 <br />500 <br />Rule I (Public Drainage Systems): <br />2022 Mounds View Fee Schedule Page 13 of 14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.