Laserfiche WebLink
Public Works Staff Report <br />Splash Pad <br />• Testing will be in open the Weekend of May 29 <br />• New UV light unit installed — Staff working on the system to fine tune the new UV <br />system. <br />Groveland Park: <br />■ Final Inspection of Punch list items on 10/25/2018 for Tennis/Basket Ball Court <br />Greenfield Park: <br />Notified by the DNR that corrections to be made to the tennis court gate entrance — ADA <br />accessible. Fencing contractor scheduled for next month Leveled the trail running in the back <br />portion of the Park, added class 5 as needed. <br />Commission will need to discuss at the August 2020, Green field baseball field. Take out all turf <br />from first and third base line and replace with Ag-lime to the fence. Most all new park <br />construction is going this way with ball fields. This would solve the wet home plate issue and <br />uneven base line issues. <br />■ Building has been re -roofed <br />Hillview Park: <br />• Commission will need to discuss at the August 2020, playground Rehabilitation. <br />Furnace at Park Shelter has been replaced — condensing still needs to be installed <br />Lambert Park <br />Inventory of Hockey Rink boards to re -place started. <br />Commission will need to discuss at the August 2020 Meeting size of the Hockey Rink. <br />Random Park: <br />• Commission will need to discuss at the August 2020, playground Rehabilitation <br />Silver View Park <br />• Ramsey County continues to work in re -profiling the draining ditch along County Road I and <br />Silver View Road, located in Silver View Park. <br />• Four new pond aerators installed in the Storm Water Pond <br />Woodcrest Park <br />• Working with Stantec Engineering and Ramsey County on some drainage issues in the Park. <br />Application to perform some storm water pond maintenance was submitted top RCWD. <br />• Met with contractor — work will be scheduled for this winter — postponed <br />2 1 P a g e <br />