My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08-26-2021
MoundsView
>
Commissions
>
Parks, Recreation & Forestry Commission
>
Agenda Packets
>
2020-2029
>
2021
>
08-26-2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/9/2021 10:00:50 AM
Creation date
11/9/2021 9:58:53 AM
Metadata
Fields
Template:
MV Parks, Recreation & Forestry Commission
Documnet Type
Packet
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Public Works Staff Report <br />City Hall Camaus: <br />• New Picnic Shelters are being built, will be ready for next season rental. <br />• Worked with plumber and vendor to winterize the splash pad. <br />■ Installation of the New Picnic Tables started <br />• Wood chipped trees <br />Splash Pad <br />• Testing will be in open the Weekend of May 29 <br />• New UV light unit installed — Staff working on the system to fine tune the new UV <br />system. <br />Groveland Park: <br />Final Inspection of Punch list items on 10/25/2018 for Tennis/Basket Ball Court <br />Working on tennis lights they are not working <br />Greenfield Park: <br />• Notified by the DNR that corrections to be made to the tennis court gate entrance — ADA <br />accessible. Fencing contractor scheduled for next month Leveled the trail running in the back <br />portion of the Park, added class 5 as needed. <br />• Commission will need to discuss at the August 2020, Green field baseball field. Take out all turf <br />from first and third base line and replace with Ag-lime to the fence. Most all new park <br />construction is going this way with ball fields. This would solve the wet home plate issue and <br />uneven base line issues. <br />• Building has been re -roofed <br />• Doggie pot dispenser repaired, lock was vandalized <br />Hillview Park: <br />• Commission will need to discuss at the August 2020, playground Rehabilitation. <br />• Furnace at Park Shelter has been replaced — condensing still needs to be installed. <br />• Bathroom locks repaired interior and exterior <br />Lambert Park <br />• Inventory of Hockey Rink boards to re -place started. <br />• Commission will need to discuss at the August 2020 Meeting size of the Hockey Rink <br />• Exterior drinking fountain repaired, it was pulled loose from the building. <br />Random Park: <br />• Commission will need to discuss at the August 2020, playground Rehabilitation <br />• Carpets shampooed <br />2 1 P a g e <br />
The URL can be used to link to this page
Your browser does not support the video tag.