My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packets - 2022/06/13
MoundsView
>
Commissions
>
City Council
>
Agenda Packets
>
2020-2029
>
2022
>
Agenda Packets - 2022/06/13
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2025 4:48:31 PM
Creation date
6/13/2022 10:16:29 AM
Metadata
Fields
Template:
MV Commission Documents
Commission Name
City Council
Commission Doc Type
Agenda Packets
MEETINGDATE
6/13/2022
Supplemental fields
City Council Document Type
Packets
Date
6/13/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
148
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
D. The Contractor expressly agrees to obey the verbal or written direction and <br />instruction of the Engineer, Inspector, or Owners Representative in determining <br />when the abrasive blasting operation may proceed or must be suspended due to <br />drift of dust, spent abrasive and paint chips outside the area of containment. <br />E. Screens used for containment shall be inspected and approved for use by the <br />Engineer, Inspector or Owner's Representative. Windscreens used for <br />containment shall be solid screens. They shall be UV -Stabilized, weather and <br />solvent resistant. <br />F. Disposal of Waste materials generated by the Contractor or his subcontractor(s) <br />will be as specified in 3.09 above. <br />G. Contractor shall provide submittal of the containment plan outlining all the details <br />in drawings, including equipment, tarps, and dust collection equipment. <br />H. The containment plan must be in conformance with this specification. Included in <br />the containment plan submittal are the engineering controls for the reduction, <br />removal, and control of lead dust for compliance with worker health and <br />environmental regulations. <br />L THE CONTAINMENT PLAN MUST BE SUBMITTED FOR REVIEW AND <br />APPROVAL BY THE ENGINEER SEVEN (7) DAYS BEFORE THE <br />PRECONSTRUCTION MEETING. Work on the project will not begin without an <br />approved containment plan. <br />END OF SECTION <br />P05367-2016-000 / Mounds View 09 96 20 - 18 PRESSURE VESSEL COATING <br />2019 WTP Rehabilitation SYSTEMS <br />
The URL can be used to link to this page
Your browser does not support the video tag.