Laserfiche WebLink
SHANK CONSTRUCTORS, INC. <br />Mounds View 2019 WTP Rehabilitation Project <br />CPR Itemized Breakdown <br />PCO 26 - Work Directive No. 1 <br />Material <br />Labor <br />Unit <br />Description <br />Qty. <br />Unit <br />Total <br />Unit <br />Hours <br />Material & Labor <br />1 <br />12152.00 <br />12,152.00 <br />135.00 <br />135.0 <br />1/2" <br />pipe <br />20 <br />2.49 <br />49.80 <br />0.04 <br />0.8 <br />1/2" <br />90 elbow <br />6 <br />9.60 <br />57.60 <br />0.10 <br />0.6 <br />1/2" <br />copper mnpt adapt <br />2 <br />12.40 <br />24.80 <br />0.22 <br />0.4 <br />1/2" <br />jaco tube adaptor + tubing <br />4 <br />4.10 <br />16.40 <br />0.50 <br />2.0 <br />1/2" <br />split ring hanger, rod, anchor <br />4 <br />17.50 <br />70.00 <br />1.27 <br />5.1 <br />From Kodru Mooney <br />- <br />8" <br />Kinetrol 107 pneumatic actuator <br />2 <br />1830.00 <br />3,660.00 <br />8" <br />Factory Rep Install Actuators <br />1 <br />1250.00 <br />1,250.00 <br />8" <br />Actuator startup and adjustment <br />1 <br />750.00 <br />750.00 <br />Transportation to Site <br />1 <br />- <br />Consumable Tools <br />1 <br />$1,030.50 <br />1,030.50 <br />Safety <br />1 <br />$873.31 <br />873.31 <br />Cleanup <br />1 <br />$436.65 <br />436.65 <br />Non -Productive Supervision\New Layout\Redesign <br />1 <br />12.00 <br />12.0 <br />Change Docum., Drwgs, Schedule & As -Built Costs <br />1 <br />TOTALS <br />20,371.07 <br />155.9 <br />Labor Rate <br />$112.02 <br />Labor Total <br />17,466.16 <br />Sales Tax - 7.375% <br />1,502.37 <br />TOTAL MATERIAL & LABOR <br />39,339.59 <br />PCO 26 - Work Directive #01 Page 3 Printed: 6/21/2022 <br />