Laserfiche WebLink
Industrial 5141 Lakeland Avenue North <br />CommercialCLMErystal, Minnesota 55429 <br />KUnderground � `, �4 <br />,I= Telephone: (763 2 <br />Fax: (7fi8j 24-1258i�SB <br />June 21, 2022 <br />Mr. John Lewis <br />Shank Constructors <br />1401 Park Rd. <br />Chanhassen, MN 55317 <br />Re: Mounds View - 2019 WTP Rehabilitation Project <br />Dear Jason, <br />Killmer Electric Company proposes to the following change to our contract for the <br />subject project: <br />Cost Change Proposal — RFP 5 — Drain down Piping Modifications <br />KEC will relocate Conduit and wiring from FLT1-DRN-BFV2 and Repurpose as FLT1- <br />DRN-BFV3. Also to provide conduit, wire, and Control Panel Mods for FLT-DRN-BFV1 <br />This work to be completed at (2) plants. Plant 2 and 3. <br />RFP #5 - Relocate Pneumatic Operator and Install (1) new Pneumatic Operator Per Plant <br />QTY <br />Mat <br />unit <br />Mat total <br />Labor unit <br />Total <br />labor <br />Control Panel Wiring Mods and <br />Update <br />1 <br />791 <br />$791.00 <br />0 <br />Connect Valve <br />4 <br />38 <br />$152.00 <br />3 <br />12 <br />Control panel Connections <br />2 <br />20 <br />$40.00 <br />3 <br />6 <br />3/4" Rigid <br />200 <br />4.25 <br />$850.00 <br />0.065 <br />13 <br />#14 THHN <br />1300 <br />0.165 <br />$214.50 <br />0.005 <br />6.5 <br />Totals <br />Tax <br />$2,047.50 <br />$140.77 <br />$2,188.27 <br />37.5 <br />1051 <br />hour <br />$3,937.50 <br />$3,937.50 <br />$6,125.77 <br />Mark -Up <br />15% <br />$918.86 <br />Total <br />$7,044.63 <br />Cost of Work for both Plants: $7,044.63 <br />Please call with any questions or comments. <br />Regards, <br />Matthew Pettit <br />Project Manager <br />An Equal Opportunity Employer <br />