My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packets - 2022/11/14
MoundsView
>
Commissions
>
City Council
>
Agenda Packets
>
2020-2029
>
2022
>
Agenda Packets - 2022/11/14
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2025 4:51:08 PM
Creation date
11/14/2022 10:48:13 AM
Metadata
Fields
Template:
MV Commission Documents
Commission Name
City Council
Commission Doc Type
Agenda Packets
MEETINGDATE
11/14/2022
Supplemental fields
City Council Document Type
Packets
Date
11/14/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
135
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Residential Water — Over 24,000 gallons <br />$-3,29 $3.42 1,000 <br />per gallons per quarter <br />Commercial Water Usage Base Charge <br />$20.00 $21.00 <br />per quarter <br />Commercial Water — 0 to 125,000 gallons <br />$2.60 $2.70 1,000 <br />per gallons per quarter <br />Commercial Water — 125,000 to 700,000 gallons <br />$2.86 $2.97 per 1,000 gallons per quarter <br />Commercial Water — 700,001 to 1,100,000 gallons <br />$3,1-5 $3.27 per 1,000 gallons per quarter <br />Commercial Water — Over 1,100,000 gallons <br />$-3,62 $3.76 per 1,000 gallons per quarter <br />Water Quality Testing Charge (State) <br />$ 2.43 per connection per quarter <br />Water Service Line Repair Insurance Charge <br />$ 8.00 per connection per quarter <br />Failure to participate or grant access regarding <br />Public Works Ordinance Programs. <br />(Installation/Repair/Inspect/Replace) <br />$150 per connection per quarter <br />Utility Bill Late Payment <br />10% of delinquent bill amount <br />Utility Bill Assessment Search <br />$10 <br />Water Service Connection/Repair/Disconnect <br />Size Less than 4 Inches <br />$100 plus surcharge <br />Water Service Connection/Repair/Disconnect <br />Size Over 4 Inches <br />$150 plus surcharge <br />Water Service Inspection or Reinspection After <br />Hours <br />After hours call -out rate per visit (Minimum 2 hours) <br />Manual Water Meter Read <br />After hours call -out rate per visit <br />Hydrant Meter Deposit <br />$2,500 <br />Hydrant Meter Rental (One Week Minimum) <br />$50 per week <br />$150 per month <br />Water Shut-Off/Turn-On <br />No charge during normal business hours, otherwise one <br />hour at call -out rate per visit <br />Water Shut-Off/Turn-On (Snowbirds) <br />$25 per shut —off <br />$25 per turn -on <br />Water Meter Testing <br />Call -out rate per visit (Minimum 2 hours) <br />Water Testing <br />One hour at call -out rate <br />Water Meter <br />City cost plus 10% administrative fee <br />Water Meter Radio Remote Reading Device <br />City cost plus 10% administrative fee <br />Curb Stop — Valve Cover <br />City cost plus 10% administrative fee <br />Municipal Sanitary Sewer System Fees (Title V, Chapter 52) <br />I/I Application Fee — H2OPP Program <br />$150 per lateral line <br />Sewer Service Availability Charge (SAC) <br />$2,485 per Metropolitan Council Environmental Services <br />Sewer Usage Rate <br />Per Quarter <br />Sewer Usage Rate <br />$3,27 $3.40 1,000 water sold <br />per gallons per quarter <br />Sewer Service Charge, Residential <br />$4.1,06 $42.70 per residential equivalent unit (REU) <br />connection per quarter <br />Sewer Service Charge, Commercial/Industrial/ <br />Public Buildings and Churches <br />$1-00.85 $104.88 per REU connection per quarter <br />Sewer Connection/Repair/Disconnect <br />$100 plus surcharge <br />Sewer Unit Charge (New Connection Only) <br />$150 per connection <br />Sewer Inspection or re -inspection after hours. <br />Call -out rate per visit (Minimum 2 hours) <br />Surface Water Management (SWM) Utility Fees (Title V, Chapter 53) <br />SWM New Construction, R-1 <br />$212 per lot <br />SWM New Construction, R-2 <br />$1,038 per acre <br />SWM New Construction, R-3, R-4, R-O <br />$1,500 per acre <br />SWM New Construction, B-1, B-2, B-3, B-4 <br />$1,500 per acre <br />SWM New Construction, 1-1, PUD <br />$2,096 per acre <br />2023 Mounds View Fee Schedule <br />Page 12 of 14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.