My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packets - 2022/11/14
MoundsView
>
Commissions
>
City Council
>
Agenda Packets
>
2020-2029
>
2022
>
Agenda Packets - 2022/11/14
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2025 4:51:08 PM
Creation date
11/14/2022 10:48:13 AM
Metadata
Fields
Template:
MV Commission Documents
Commission Name
City Council
Commission Doc Type
Agenda Packets
MEETINGDATE
11/14/2022
Supplemental fields
City Council Document Type
Packets
Date
11/14/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
135
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
SWM Utility Rate Charge, R-1 Single Family and <br />R-2 Single and Two Family Residential <br />$5.00 $16.00 per unit per quarter <br />SWM Utility Rate Charge, R-3 Medium Density <br />Residential <br />$89-1- $87.37 per acre per quarter <br />SWM Utility Rate Charge ,R-4 High Density <br />Residential, R-5 Mobile Homes and R-O <br />Residential Office <br />$9� $103.60 per acre per quarter <br />SWM Utility Rate Charge ,B-1 Neighborhood <br />Business, B-2 Limited Business, B-3 Highway <br />Business and B-4 Regional Business <br />$427,22 $135.71 per acre per quarter <br />SWM Utility Rate Charge, 1-1 Industrial <br />$9 $109.96 acre <br />per per quarter <br />SWM Utility Rate Charge, PUD Planned Unit <br />Development <br />$41-2,65 $120.16 per acre per quarter <br />SWM Utility Rate Charge, CRP Conservancy, <br />Recreation and Preservation <br />$15.00 $16.00 per acre per quarter <br />SWM Utility Rate Charge, School or Church, <br />Public or Private <br />Q^� $48.76 per acre per quarter <br />Illicit Discharge Fee <br />To be determined by the Public Works Director on a case - <br />by -case scenario. <br />--Storm Water Management (The permit fee schedule adopted 08/24/2016 by the Rice Creek Watershed District <br />Board. The fee for a permit is the cumulative total of all individual aspects of a project. Government entities are <br />exempt from the permit fees). <br />Rule C (Storm water Management): <br />Single lot, single family residential projects <br />Home, Accessory Structure, Driveway, Etc. <br />$150 <br />Residential, Commercial, Industrial, Institutional Development <br /><1 acre of new or reconstruction impervious <br />surface <br />$1,000 <br />1-2.5 acres of new or reconstructed <br />impervious surface <br />$2,000 <br />2.5-5 acres of new or reconstructed <br />impervious surface <br />$3,500 <br />>5 acres of new or reconstructed <br />impervious surface <br />$5,000 plus $1,000 per acre (capped at $10,000) <br />Rule D (Erosion Control Plans): <br /><2.5 acres of land disturbance <br />$100 <br />2.5-10 acres of land disturbance <br />$250 <br />>10 acres of land disturbance <br />$500 <br />Rule E (Floodplain Alteration) <br />No mitigation required <br />No Fee <br />Mitigation required <br />_ <br />$100 <br />Rule F (Wetland Alteration) <br />Exemption <br />$250 <br />< 1 acre of mitigation required <br />$875 <br />1-5 acres of mitigation required <br />_ <br />$1,750 <br />5-10 acres of mitigation required <br />$3,500 <br />>10 acres <br />$5,250 <br />Banking Plan <br />$1,750 <br />Rule G (Regional Conveyance Systems): <br />_ <br />$500 <br />Rule I (Public Drainage Systems): <br />$500 <br />Note: An action that requires a permit under both Rule <br />G and Rule I will be subject under those rules to a single permit <br />for costs has been provided under MN Statute 103E, a Rule <br />fee of $500. Additionally, if the action is one for which a bond <br />G/Rule I fee will not be required. <br />_ <br />Rule J (Appropriate of Public Water): No Fee <br />2023 Mounds View Fee Schedule <br />Page 13 of 14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.