Laserfiche WebLink
2023 Mounds View Fee Schedule Page 13 of 14 <br />SWM Utility Rate Charge, R-1 Single Family and <br />R-2 Single and Two Family Residential <br />$5.00 $16.00 per unit per quarter <br />SWM Utility Rate Charge, R-3 Medium Density <br />Residential <br />$81.91 $87.37 per acre per quarter <br />SWM Utility Rate Charge ,R-4 High Density <br />Residential, R-5 Mobile Homes and R-O <br />Residential Office <br />$97.12 $103.60 per acre per quarter <br />SWM Utility Rate Charge ,B-1 Neighborhood <br />Business, B-2 Limited Business, B-3 Highway <br />Business and B-4 Regional Business <br />$127.22 $135.71 per acre per quarter <br />SWM Utility Rate Charge, I-1 Industrial $99.33 $109.96 per acre per quarter <br />SWM Utility Rate Charge, PUD Planned Unit <br />Development <br />$112.65 $120.16 per acre per quarter <br />SWM Utility Rate Charge, CRP Conservancy, <br />Recreation and Preservation <br />$15.00 $16.00 per acre per quarter <br />SWM Utility Rate Charge, School or Church, <br />Public or Private <br />$45.71 $48.76 per acre per quarter <br />Illicit Discharge Fee To be determined by the Public Works Director on a case- <br />by-case scenario. <br /> <br />Storm Water Management (The permit fee schedule adopted 08/24/2016 by the Rice Creek Watershed District <br />Board. The fee for a permit is the cumulative total of all individual aspects of a project. Government entities are <br />exempt from the permit fees). <br />Rule C (Storm water Management): <br /> Single lot, single family residential projects <br />Home, Accessory Structure, Driveway, Etc. $150 <br />Residential, Commercial, Industrial, Institutional Development <br /><1 acre of new or reconstruction impervious <br />surface <br />$1,000 <br />1-2.5 acres of new or reconstructed <br />impervious surface <br />$2,000 <br />2.5-5 acres of new or reconstructed <br />impervious surface <br />$3,500 <br />>5 acres of new or reconstructed <br />impervious surface <br />$5,000 plus $1,000 per acre (capped at $10,000) <br />Rule D (Erosion Control Plans): <br /> <2.5 acres of land disturbance $100 <br /> 2.5-10 acres of land disturbance $250 <br /> >10 acres of land disturbance $500 <br />Rule E (Floodplain Alteration) <br /> No mitigation required No Fee <br /> Mitigation required $100 <br />Rule F (Wetland Alteration) <br /> Exemption $250 <br /> < 1 acre of mitigation required $875 <br /> 1-5 acres of mitigation required $1,750 <br /> 5–10 acres of mitigation required $3,500 <br /> >10 acres $5,250 <br /> Banking Plan $1,750 <br />Rule G (Regional Conveyance Systems): $500 <br />Rule I (Public Drainage Systems): $500 <br />Note: An action that requires a permit under both Rule G and Rule I will be subject under those rules to a single permit <br />fee of $500. Additionally, if the action is one for which a bond for costs has been provided under MN Statute 103E, a Rule <br />G/Rule I fee will not be required. <br />Rule J (Appropriate of Public Water): No Fee