My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ordinance 993
MoundsView
>
Commissions
>
City Council
>
Ordinances
>
2020-2029
>
2022
>
Ordinance 993
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2025 10:17:54 AM
Creation date
11/17/2022 11:57:49 AM
Metadata
Fields
Template:
MV Commission Documents
Commission Name
City Council
Commission Doc Type
Ordinances
MEETINGDATE
11/14/2022
Commission Doc Number (Ord & Res)
993
Supplemental fields
City Council Document Type
Ordinances
Date
11/14/2022
Resolution/Ordinance Number
993
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
2023 Mounds View Fee Schedule Page 12 of 14 <br />Residential Water – Over 24,000 gallons $3.29 $3.42 per 1,000 gallons per quarter <br />Commercial Water Usage Base Charge $20.00 $21.00 per quarter <br />Commercial Water – 0 to 125,000 gallons $2.60 $2.70 per 1,000 gallons per quarter <br />Commercial Water – 125,000 to 700,000 gallons $2.86 $2.97 per 1,000 gallons per quarter <br />Commercial Water – 700,001 to 1,100,000 gallons $3.15 $3.27 per 1,000 gallons per quarter <br />Commercial Water – Over 1,100,000 gallons $3.62 $3.76 per 1,000 gallons per quarter <br />Water Quality Testing Charge (State) $ 2.43 per connection per quarter <br />Water Service Line Repair Insurance Charge $ 8.00 per connection per quarter <br />Failure to participate or grant access regarding <br />Public Works Ordinance Programs. <br />(Installation/Repair/Inspect/Replace) <br />$150 per connection per quarter <br />Utility Bill Late Payment 10% of delinquent bill amount <br />Utility Bill Assessment Search $10 <br />Water Service Connection/Repair/Disconnect <br /> Size Less than 4 Inches <br />$100 plus surcharge <br />Water Service Connection/Repair/Disconnect <br />Size Over 4 Inches <br />$150 plus surcharge <br />Water Service Inspection or Reinspection After <br />Hours <br />After hours call-out rate per visit (Minimum 2 hours) <br />Manual Water Meter Read After hours call-out rate per visit <br />Hydrant Meter Deposit $2,500 <br />Hydrant Meter Rental (One Week Minimum) $50 per week <br />$150 per month <br />Water Shut-Off/Turn-On No charge during normal business hours, otherwise one <br />hour at call-out rate per visit <br />Water Shut-Off/Turn-On (Snowbirds) $25 per shut –off <br />$25 per turn-on <br />Water Meter Testing Call-out rate per visit (Minimum 2 hours) <br />Water Testing One hour at call-out rate <br />Water Meter City cost plus 10% administrative fee <br />Water Meter Radio Remote Reading Device City cost plus 10% administrative fee <br />Curb Stop – Valve Cover City cost plus 10% administrative fee <br /> <br />Municipal Sanitary Sewer System Fees (Title V, Chapter 52) <br /> <br />I/I Application Fee – H20PP Program $150 per lateral line <br />Sewer Service Availability Charge (SAC) $2,485 per Metropolitan Council Environmental Services <br />Sewer Usage Rate Per Quarter <br />Sewer Usage Rate $3.27 $3.40 per 1,000 gallons water sold per quarter <br />Sewer Service Charge, Residential $41.06 $42.70 per residential equivalent unit (REU) <br />connection per quarter <br />Sewer Service Charge, Commercial/Industrial/ <br />Public Buildings and Churches <br />$100.85 $104.88 per REU connection per quarter <br />Sewer Connection/Repair/Disconnect $100 plus surcharge <br />Sewer Unit Charge (New Connection Only) $150 per connection <br />Sewer Inspection or re-inspection after hours. Call-out rate per visit (Minimum 2 hours) <br /> <br />Surface Water Management (SWM) Utility Fees (Title V, Chapter 53) <br /> <br />SWM New Construction, R-1 $212 per lot <br />SWM New Construction, R-2 $1,038 per acre <br />SWM New Construction, R-3, R-4, R-O $1,500 per acre <br />SWM New Construction, B-1, B-2, B-3, B-4 $1,500 per acre <br />SWM New Construction, I-1, PUD $2,096 per acre
The URL can be used to link to this page
Your browser does not support the video tag.