My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packets - 2022/11/28
MoundsView
>
Commissions
>
City Council
>
Agenda Packets
>
2020-2029
>
2022
>
Agenda Packets - 2022/11/28
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2025 4:51:19 PM
Creation date
1/10/2023 2:31:08 PM
Metadata
Fields
Template:
MV Commission Documents
Commission Name
City Council
Commission Doc Type
Agenda Packets
MEETINGDATE
11/28/2022
Supplemental fields
City Council Document Type
Packets
Date
11/28/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
190
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Resolution 9654 <br />Page 4 of 7 <br />1' per year. Homes to the east will be screened by a combination of a retaining <br />walls and fence, with a total height ' - '. (adjacent to R-1 district). <br />5 The architectural design of the project is compatible with the surrounding area; <br />FINDING: Architectural design will have similar characteristics to Gray Stone Flats, but <br />without balconies or hip roof. <br />6. The drainage and utility system plans are submitted to and subject to the approval of the <br />Director of Public Works/Parks and Recreation; <br />FINDING: The Grading & Drainage plan has been reviewed by Public Works, and Stantec <br />(City Engineer). Stormwater management will be in underground chambers <br />(under parking lot). Approval of the drainage & utility system will coincide with <br />approval of the Preliminary Plat, Final Plat, and issuance of applicable building <br />and land disturbance permits. <br />7. The development schedule insures a logical development of the site which will protect the <br />public interest and conserve land; <br />FINDING: Phase I construction is dependent upon receiving financial assistance from the <br />City ($1.8 million TIF), Ramsey County ($2.5 million ARPA Housing Development <br />Readiness Solicitation), and Minnesota Management & Budget/Minnesota <br />Housing ($ million). If funded (2023), construction must begin June 2023, and <br />completed October 2024. The project cost is $28.7 million. There is no timetable <br />for Phase /I. <br />[The development schedule will be clarified in the Development Agreement] <br />8. The development is in compliance with the requirements of Ch. 154 [Floodplain <br />Management], 155 [Surface Water Drainage Management and Development Controls], 156 <br />[Construction Site and Land Disturbance Runoff Control], 158 [Subdivision] and 159 <br />[Wetland Zoning] of this code of ordinances; and, <br />FINDING: Compliance is conditioned upon approval of the Preliminary Plat, Final Plat, <br />Building permits, and applicable land disturbance permits. <br />9. Dwelling unit and accessory use requirements are in compliance with the district provisions <br />in which the development is planned. <br />FINDING: Dwelling unit requirements is sufficient, as determined by this Resolution (PUD <br />and Development Review). There are no accessory uses proposed. <br />WHEREAS, Mounds View City Code §160.452(B) establishes the criteria for granting a <br />Conditional Use Permit (Findings in italics): <br />10. The use will not create an excessive burden on existing parks, schools, streets and other <br />public facilities and utilities which serve or are proposed to serve the area; <br />
The URL can be used to link to this page
Your browser does not support the video tag.