My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1154-22 Woodale Apartments, Zoning, Preliminary Plat, PUD, Dev Rev
MoundsView
>
Commissions
>
Planning & Zoning Commission
>
Resolutions
>
2020-2029
>
2022
>
1154-22 Woodale Apartments, Zoning, Preliminary Plat, PUD, Dev Rev
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/30/2023 3:28:13 PM
Creation date
1/30/2023 3:28:03 PM
Metadata
Fields
Template:
MV Planning Commission
DOC TYPE
RESOLUTIONS
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Resolution 1154-22 <br />Page 4 of 9 <br />FINDING: Phase 1 will include one 140-unit apartment building. Phase 1 & 11 will be situated <br />such that surface parking will be mostly screened from street view by the <br />building(s). Western (adjacent to R-1) screening will include 8' tall coniferous <br />trees, which will grow to 40' — 60' in height at maturity. These trees grow about <br />1' per year. Homes to the east will be screened by a combination of a retaining <br />walls and fence, with a total height_'-_-. (adjacent to R-1 district). <br />10. The architectural design of the project is compatible with the surrounding area; <br />FINDING: Architectural design will have similar characteristics to Gray Stone Flats, but <br />without balconies or hip roof. <br />11. The drainage and utility system plans are submitted to and subject to the approval of the <br />Director of Public Works/Parks and Recreation; <br />FINDING: The Grading & Drainage plan has been reviewed by Public Works, and Stan tec <br />(City Engineer). Stormwater management will be in underground chambers <br />(under parking lot). Approval of the drainage & utility system will coincide with <br />approval of the Preliminary Plat, Final Plat, and issuance of applicable building <br />and land disturbance permits. <br />12. The development schedule insures a logical development of the site which will protect the <br />public interest and conserve land; <br />FINDING: Phase 1 construction is dependent upon receiving financial assistance from the <br />City ($1.8 million TIF), Ramsey County ($2.5 million ARPA Housing Development <br />Readiness Solicitation), and Minnesota Management & Budget/Minnesota <br />Housing ($ million). If funded (2023), construction must begin June 2023, and <br />completed October 2024. The project cost is $28.7 million. There is no timetable <br />for Phase 11. <br />13. The development is in compliance with the requirements of Ch. 154 [Floodplain <br />Management], 155 [Surface Water Drainage Management and Development Controls], 156 <br />[Construction Site and Land Disturbance Runoff Control], 158 [Subdivision] and 159 <br />[Wetland Zoning] of this code of ordinances, and, <br />FINDING: Compliance is conditioned upon approval of the Preliminary Plat, Final Plat, <br />Building permits, and applicable land disturbance permits. <br />14. Dwelling unit and accessory use requirements are in compliance with the district provisions <br />in which the development is planned. <br />FINDING: Dwelling unit requirements is sufficient, as determined by this Resolution (PUD <br />and Development Review). There are no accessory uses proposed. <br />