Laserfiche WebLink
• Vehicle characteristics affecting pavement damage include axle loads (greatest <br />effect), inequalities in load sharing on tandem axles, axle spacing, tire inflation <br />pressure, tire configuration <br />• Road characteristics affecting pavement damage include current pavement condition, <br />existing roughness (a road with a PSI of 2.5 is damaged at rate 50% greater than a <br />road with a PSI of 4.0), and high temperatures (rutting can increase by a factor of 16 <br />when pavement temperatures increase from 77 to 120 °F) <br />RPI Consulting, Rio Blanco County, Colorado (9) <br />Rio Blanco County commissioned a study by RPI Consulting, which was completed in 2008, to <br />study the impacts of trucks on their county roads, and to determine an appropriate fee for new <br />truck loads that were not anticipated when the road was designed and constructed. This analysis <br />was directed at all aspects of truck traffic, and other causes of increased traffic loading, such as <br />the gas and oil industry, residential and industrial developments, and others. <br />In 2001, the Colorado state legislature provided counties with the legal authority to assess impact <br />fees to new development, in order to help fund capital facilities related to those new <br />developments. <br />The impact fee is based on the computed ESALs produced (or expected to be produced) by the <br />development. The consultant determined that $9.07 per ESAL is the total damage to the road <br />system and other aspects of the transportation infrastructure. Based on typical number of truck <br />loads, the impact fee schedule reduced this to a fee per unit, as follows. <br />Table 1. Rio Blanco Road Impact Fee Schedule. <br />Development Type <br />Road impact Fee <br />Residential (per housing unit) <br />Single Family <br />$600 <br />Multi -family <br />$400 <br />Non -Residential (per 1000 sf of floor area) <br />Shopping Center <br />$6,500 <br />Office/Institutional <br />$1,700 <br />General Commercial <br />$1,900 <br />Mixed Industrial <br />$1,000 <br />Warehousing <br />$800 <br />Manufacturing <br />$600 <br />Gas or Oil Well <br />$17,700 (per well) <br />Much of the remainder of the report is devoted to the methodology for estimating the amount and <br />type of traffic expected for each development type. <br />Rufolo, Cascade Policy Institute, 1995 (10) <br />In 1995, Anthony Rufolo produced a "Policy Perspective" on Cost -Based Road Taxation. The <br />following are excerpts from this three -page paper. <br />