Laserfiche WebLink
Heavy Vehicle Impacts Tool <br />Individual Segment Analysis Report <br />Analysis Name <br />Heavyl/ehiclesSarWfe <br />Segment Name <br />11TH ST <br />From I To <br />MAPLE ST to WALNUT ST <br />Segment Length, ft <br />416.0 <br />Segment Length, mI <br />0.08 <br />Percent Life Consumed <br />13.1 <br />Total Segment Consumed Life Costj <br />$21,581 <br />Additlonal Asphalt Thickness <br />0.9 in. <br />Total Addihrnal Asphalt Cost <br />$30,,541 <br />100 <br />90 <br />80 <br />70 <br />a 60 <br />50 <br />V <br />a 40 <br />i <br />IL 30 <br />20 <br />10 <br />0 <br />..y . aly— <br />vehicles per <br />WZI. Week Full lE tv <br />- Tanker Truck 5 Empty <br />Waste - Side L� 10 112 Full <br />�PCI Without Additional Heavy Veh ides <br />— — PCI Wth Additional Heavy Vehicles <br />—ESALswith out AdditicnaI Heavy Vehicles <br />ESALs With Additional Heavy Vehicles <br />350,000 <br />PO <br />% <br />0 2 4 6 a 10 12 14 16 18 <br />Years since Beginning of Analysis <br />Heavy Vehicle Impacts Tool <br />Version 0.99 <br />300,000 <br />250,000 J <br />Q <br />U3 <br />200,000 lL <br />m <br />150,000 is <br />100,000 [) <br />50,000 <br />0 <br />20 <br />Analysis Date: 10 May2014 <br />Figure 19. Sample printed report —individual segment. <br />34 <br />