My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packets - 2023/03/03
MoundsView
>
Commissions
>
City Council
>
Agenda Packets
>
2020-2029
>
2023
>
Agenda Packets - 2023/03/03
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2025 4:46:48 PM
Creation date
3/7/2023 10:21:54 AM
Metadata
Fields
Template:
MV Commission Documents
Commission Name
City Council
Commission Doc Type
Agenda Packets
MEETINGDATE
3/3/2023
Supplemental fields
City Council Document Type
Packets
Date
3/3/2023
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
393
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
IHeauyVehides5arnple-IiVehicles lmpacts Too l l� <br />- Select Method of Analysis <br />Network Level <br />r Street Segment Level <br />Network Analysis and Report <br />Consumed Life 1 Design <br />Additional ESALs per year: <br />3,908 <br />Average percent of life consumed over <br />design period, % 11 <br />Network cost of consumed life, Vane "93.983 <br />mile <br />This analysis reports the portion of the original design <br />ife (in ESALs) that is consumed by the additional heavy <br />ehides over the life of the street segment. <br />Print Summary OK <br />Figure 20. Sample results screen — Network analysis, consumed life. <br />- Select Method of Analysis <br />t' Network Level <br />f' 'Street Segment Level <br />Network Analysis and Report <br />Consumed Life Design 1 <br />Average additional bituminous thickness <br />required, inch 1' <br />Network cost of additional bituminous at SL22i o89 <br />construction, $ <br />This analysis reports the difference in bituminous layer <br />cImess, using the Mn fDOT Granular Equivalent <br />method, with and without the additional heavy <br />ehides. The incremental cost of the bituminous layer <br />s assumed to be the same as for an overlay. <br />Print Summary OK <br />Figure 21. Sample results screen — Network analysis, pavement design comparison. <br />35 <br />
The URL can be used to link to this page
Your browser does not support the video tag.