My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Park Needs Analysis- 2004 List of Needs FINAL VERSION 2-25-2005
MoundsView
>
Commissions
>
Parks, Recreation & Forestry Commission
>
Agenda Packets
>
2000-2009
>
2005
>
08-25-2005
>
Park Needs Analysis- 2004 List of Needs FINAL VERSION 2-25-2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/29/2023 2:02:09 PM
Creation date
3/29/2023 1:32:23 PM
Metadata
Fields
Template:
MV Parks, Recreation & Forestry Commission
Documnet Type
Packet
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
7. Repair/sealcoat parking lot of Greenfield Park. B ($2,500) <br /> <br />8. Add Netting at Greenfield Park along the third baseline to address foul <br />nd <br />balls. Suggested at the May 22 meeting. ($4,000) <br /> <br />9. Greenfield Park Trail - repair/sealcoat. B ($1,000) <br /> <br />10. Silver View Path - repair/sealcoat B ($7,200 - $5,200 for seal coat/$2,00 <br />for repairs) <br /> <br /> <br />C. Long Term (add to Capital Improvement <br />Program) <br />1. Irrigation System at City Hall – add an irrigation system to the south, east, and <br />west side for City Hall. Currently in CIP for 2005. C – 2005 ($12,000) <br /> <br />2. Edgewood Drive Boulevard Project – place colored concrete or brick pavers <br />between the curb and pathway on Edgewood Drive. C- 2006 ($28,000) <br /> <br />3. Playground replacement at City Hall. Park. C- 2007 ($31,000) (includes <br />$6,000 for fibarfill) <br /> <br />4. Community Center Parking Lot – redesign so the front ends of vehicles do not <br />overhang the sidewalk. There is a drainage problem that needs to be addressed <br />in front of the daycare. Add storm sewer catch basin and pipe it out to <br />Bronson Drive. C- 2007 ($30,000) <br /> <br />5. Tennis Courts of Greenfield Park – Clean up, crack seal surface, slurry coat, <br />add a gate to the fence for maintenance purposes. Suggested during May 8, <br />2003 park tour. C – 2006 ($10,000) <br /> <br />6. Look into developing a soccer field in the undeveloped area near Trunk <br />Highway 10 of Greenfield Park. Suggested during May 8, 2003 park tour. C – <br />2009 ($50,000) <br /> <br />7. Park Lighting Program – Add / replace lights on all City property. Replace <br />with energy efficient fixtures. Must have a positive cost/benefit ratio. C – <br />($150,000 in CIP; $100,000 from Park Dedication, $50,00 from Special <br />Project Fund) This program is currently being developed. Highly subject to <br />change. <br /> <br />8. Replace security light with more efficient fixtures at Greenfield Park. Park <br />Foreman Recommendation. C – 2006 ($5,000) May be part of larger Park <br />Lighting Project. See item C8 <br /> <br /> 4 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.