Laserfiche WebLink
9. Park Building at Groveland Park – replace existing building. 2004 design / <br />2005 construction C – 2004/2005 ($20,000 in 2004 for Design/ $227,000 in <br />2005 for Construction) <br /> <br />10. Playground replacement at Hillview Park. C – 2008 ($32,000 -includes <br />$6,000 for fiberfill) <br /> <br />11. Park Building at Lambert Park – replace existing building. CIP 2010 design / <br />2011 construction C – 2010 ($250,000 $20,000 in 2010 for Design/ $230,000 <br />in 2011 for Construction) <br /> <br />12. Elevation on ballfield and repair drainage ditch at Lambert Park. Park <br />Foreman Recommendation. C – 2007 ($25,000) <br /> <br />13. Pave the pathway on the northwest corner of Hillview and Quincy at <br />Oakwood Park. Suggested during May 8, 2003 park tour. C – 2007 <br /> <br />14. Determine the feasibility of developing a small soccer field at the northwest <br />corner of Hillview and Quincy at Oakwood Park. Suggested during May 8, <br />2003 park tour. C – 2006 ($20,000+$4,000) <br /> <br />15. Park Building at Random Park – replace existing building. CIP 2010 design / <br />2011 construction C – 2012 ($250,000 - $20,000 in 2012 for Design/ <br />$230,000 in 2013 for Construction) <br /> <br />16. Random Parking Lot – reconstruct the parking lot. C – 2008 ($30,000) <br /> <br />17. Resurface parking lot at Silver View Park. C – 2008 ($50,000) <br /> <br />18. Paved trail at Woodcrest Park. C – 2007 <br /> <br /> <br /> 5 <br />