Laserfiche WebLink
City of Mounds View Comprehensive Plan <br />________________________________________________________________________ <br /> <br />107 <br /> <br />9. Golf Course should be designated CRP. <br />10. The Industrial area adjacent to the golf course should stay. <br />11. No new developments along State Highway 10 (118). The park and tree buffers <br /> should remain. <br />12. If manufactured home parks are redeveloped, they should be only replaced with <br /> low and medium density homes. <br /> <br /> Transportation <br /> 1. No sidewalks should be required. <br />2. Trail system is inadequate because of County Highway 10. The trail system should <br /> connect to Shoreview, Fridley, New Brighton, and along County Highway 10. The <br /> trail system should be designated in the comprehensive plan. <br />3. Keep MTC bus service as is. <br />4. Street maintenance is adequate. <br />5. Better speed limit enforcement is necessary. <br />6. Do not upgrade Anoka County airport. <br />7. Flight paths should be defined. <br />8. Any future vacation of County Highway 10 right-of -way should be reserved for <br /> public use. <br />9. Does the City plan to extend Woodlawn to the north. Several lots currently do not <br /> have street access. <br />10. The Long Lake Road County Highway 10 intersection should be reconfigured to <br /> have one left turn lane, 1 thru lane, and 1 right turn lane in each direction on Long <br /> Lake Road. <br />11. City streets should not be widened. <br /> Miscellaneous <br /> 1. Don’t use city tax dollars to buy real estate. <br />2. Consideration needs to be given to correction of problem areas in the City’s <br />surface water management plan. <br /> <br /> <br />3 <br />Forum No. 2