My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09/23/2004 Agenda & Packet
MoundsView
>
Commissions
>
Parks, Recreation & Forestry Commission
>
Agenda Packets
>
2000-2009
>
2004
>
09/23/2004 Agenda & Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/10/2024 1:44:09 PM
Creation date
4/19/2023 1:18:22 PM
Metadata
Fields
Template:
MV Parks, Recreation & Forestry Commission
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
e) Kroeger made a format for survey and will start sorting data. <br /> f) There was not a meeting Nothing to report <br /> g) What is the completion date? Approx. 2 weeks...Status? The surface and <br /> bumpers have been removed and grading has been started. <br /> h) Fishing pier will be delayed till next spring because of Minn. Cons back <br /> log. The DNR will be supervising the project. <br /> 4 a) Dazenski gave a wonderful report on what has been done off the Needs <br /> Analysis List. <br /> b) Dazenski with the aid of an aerial photo pointed out that we could make a <br /> usable but small soccer field on the Oakwood Park area. It would require <br /> elevation corrections for run off and level playing surface but it was <br /> explained that materials could be secure at low or no cost to the city. <br /> c) No other items discussed. <br /> 5 a) Porta potty has been moved to the backstop area. <br /> b) Volleyball courts: Dazenski explained that the timbers are used to <br /> contain the sand and not for boundaries. There is rope that designates <br /> the boundaries. <br /> c) Sedimentation pond: Dazenski explained that the pond had been dug <br /> out and that the engineers would have to approve final grade. The weir <br /> and culvert will be installed sometime in the next two weeks as we need <br /> to get the seed and mulch in as soon as possible. <br /> • Purple Loostrife update: We did not see any blooming on the east <br /> end of the pond and that is a very good sign that the beetles did <br /> their job! <br /> • The DNR would like to harvest beetles from our sites next spring. <br />
The URL can be used to link to this page
Your browser does not support the video tag.